LIVE DATA · sourced from the web
★★★★★Open

Staybridge Suites Dubai Financial Centre

Dubai, United Arab Emirates

Built 2005 · Last completed renovation 2020

Staybridge Suites Dubai Financial Centre in Dubai was last renovated in 2020, and originally built in 2005. Its HotelChrono freshness score is 7.9/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 18 Jun 2026How we verify →Report an error

Data check

  • · Sources disagree on the opening year — under review

Renovation forecast · estimate

Next renovation expected around 2028

In about 2 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Dubai, United Arab Emirates

Timeline

  1. 2021

    Hotel Opened

  2. 2020

    Renovation completed

⚖️ Star classification · United Arab Emirates

re-classified every 1 year

In Dubai, the hotel classification licence is valid 1 year (renewable; up to 4 years on request). Each emirate runs its own system.

System: Dubai Dept. of Economy & Tourism (Decree 17/2013)

view source →Reviewed Jun 2026Informational — verify with local authorities.

The term of the Licence will be one (1) year, renewable for the same period… and up to four (4) years.

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2020
100 − 3.5 × 6 years = 79
= 7.9 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2020 renovation

Renovation completed
Year Last Renovated: 2020source · retrieved 2026-06-18

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

5★

Built

Sourced

2005

Last completed renovation

Sourced

2020

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Built 2021weight 0.70 · retrieved 2026-06-18view source →

IHG Hotels & Resorts (IHG®) and SRG Holding have opened the third Staybridge Suites hotel in the UAE in the heart of Dubai, on the picturesque Sheikh Zayed Road in the middle of all the city action.

Secondary · Full renovation 2020weight 0.70 · retrieved 2026-06-18view source →

Year Last Renovated: 2020

Own or manage Staybridge Suites Dubai Financial Centre?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/staybridge-suites-dubai-financial-centre-dubai" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/staybridge-suites-dubai-financial-centre-dubai.svg" alt="Staybridge Suites Dubai Financial Centre — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Dubai

All hotels in Dubai

Frequently asked

When was Staybridge Suites Dubai Financial Centre built?+

Staybridge Suites Dubai Financial Centre (Dubai, United Arab Emirates) was built in 2005.

How old is Staybridge Suites Dubai Financial Centre?+

Staybridge Suites Dubai Financial Centre is 21 years old — it was built in 2005 and last renovated in 2020. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Staybridge Suites Dubai Financial Centre last renovated?+

Its most recent completed renovation was in 2020.

What is the Chrono Score of Staybridge Suites Dubai Financial Centre?+

Its Chrono Score is 7.9/10 (Ageing) — a pure freshness metric, separate from its 5-star rating.

Explore hotels by renovation status