★★★★★Open

Rixos Dubai Islands, Hotel & Residences

Dubai, United Arab Emirates

Built 2024

⟳ Renovation announced ( Q4 2026) — not yet started

Check availability →May be an affiliate link.

Rixos Dubai Islands, Hotel & Residences in Dubai was built in 2024; no completed renovation is yet on record. Its HotelChrono freshness score is 9.7/10. A renovation is announced for Q4 2026 but has not yet started — check current status before booking.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 26 Nov 2026How we verify →Report an error

Data check

  • · Renovation announced but not started — not counted as completed
  • · Sources disagree on the opening year — under review

Renovation forecast · estimate

Next renovation expected around 2032

In about 6 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Dubai, United Arab Emirates

Timeline

  1. 2024

    Construction Commenced

  2. 2024

    Construction started

  3. 2025

    Hotel expected to be completed per earlier estimate

  4. 2026

    Planned / expected reopening

  5. 2026

    Expected handover

  6. 2027

    Planned / expected reopening

⚖️ Star classification · United Arab Emirates

re-classified every 1 year

In Dubai, the hotel classification licence is valid 1 year (renewable; up to 4 years on request). Each emirate runs its own system.

System: Dubai Dept. of Economy & Tourism (Decree 17/2013)

view source →Reviewed Jun 2026Informational — verify with local authorities.

“The term of the Licence will be one (1) year, renewable for the same period… and up to four (4) years.”

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: built 2024, no completed renovation on record
100 − 1.5 × 2 years = 97
= 9.7 / 10 · Fresh

Every figure here traces back to the sourced build year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

Facts

Stars

5★

Built

Sourced

2024

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Rixos

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · expected reopening 2027weight 0.70 · retrieved 2026-11-26view source →

“Those lucky enough to check in or live at Rixos Dubai Islands, Hotel & Residences can expect a prime waterfront location with the same level of service the Rixos brand provides in its other hotels. Opening date: 2027 Dubai Islands.”

Secondary · expected reopening 2026weight 0.70 · retrieved 2026-11-26view source →

“The complex is due for completion in Q4 2026.”

Secondary · renovation_announced 2026weight 0.70 · retrieved 2026-11-26view source →

“Currently under construction, the Rixos Branded Residences project is set to be completed by Q4 2026.”

Secondary · Built 2025weight 0.70 · retrieved 2026-11-26view source →

“Expected to be completed by 2025, the property will feature a signature Rixos spa and fitness center, infinity pools, and residential units.”

Secondary · renovation_started 2024weight 0.70 · retrieved 2026-11-26view source →

“Construction Started April 29, 2024”

Own or manage Rixos Dubai Islands, Hotel & Residences?

Add your renovation date

A renovation is planned.

Renovation planned ( Q4 2026) — check timing before booking.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/rixos-dubai-islands-hotel-residences-dubai" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/rixos-dubai-islands-hotel-residences-dubai.svg" alt="Rixos Dubai Islands, Hotel & Residences — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Dubai

All hotels in Dubai →All Rixos hotels →

Frequently asked

When did Rixos Dubai Islands, Hotel & Residences open?+

Rixos Dubai Islands, Hotel & Residences opened in 2024 in Dubai. The date comes from a cited source, shown in the timeline above.

When was Rixos Dubai Islands, Hotel & Residences built?+

Rixos Dubai Islands, Hotel & Residences (Dubai, United Arab Emirates) was built in 2024.

How old is Rixos Dubai Islands, Hotel & Residences?+

Rixos Dubai Islands, Hotel & Residences is 2 years old — it was built in 2024. Age measures the building; the Chrono Score measures how fresh it feels today.

Is a renovation planned for Rixos Dubai Islands, Hotel & Residences?+

A renovation is announced/planned (expected Q4 2026) but has not started yet, so we do not count it as completed.

What is the Chrono Score of Rixos Dubai Islands, Hotel & Residences?+

Its Chrono Score is 9.7/10, but freshness is currently pending — Rixos Dubai Islands, Hotel & Residences is under renovation, so the score reflects its last completed state rather than the works in progress.