Element Detroit at the Metropolitan
Detroit, United States
Built 2018 · Last completed renovation 2018
Element Detroit at the Metropolitan in Detroit was last renovated in 2018, and originally built in 2018. Its HotelChrono freshness score is 7.2/10 — every date linked to a cited source.
Data check
- · Sources disagree on the opening year — under review
Renovation forecast · estimate
Likely due for renovation now
Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.
Photo via Wikimedia Commons
Location
Satellite view · Detroit, United States
Timeline
1925
Original Metropolitan Building constructed
2018
Historic Metropolitan Building restored and reopened as Element hotel
How this score is computed
Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →
What changed in the 2018 renovation
“It was vacant for nearly 40 years until being restored and reopened as the Element Hotel in December 2018.”— source · retrieved 2026-11-22
Scope is quoted verbatim from the cited source — we never guess what a renovation covered.
Facts
Stars
3★
Built
Sourced2018
Last completed renovation
Sourced2018
Ownership & operator
Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.
Ownership data depth
1/3 · 33%
- ✓ Operating brand
- ○ Management / operator
- ○ Ownership
FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.
See the Renovation Radar →Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“It was vacant for nearly 40 years until being restored and reopened as the Element Hotel in December 2018.”
“The Metropolitan Building in Detroit was built in 1925.”
“The 100,000 square-foot building opened in December 2018 as a 110-room extended-stay hotel, with 2,000 square feet of meeting space on the second-floor, 7,000 square feet of retail on the ground floor and lower level, and a roof patio on the 11th floor.”
Own or manage Element Detroit at the Metropolitan?
Add your renovation date
Know its timeline. Now check the price.
You’ve seen when it was last renovated — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/element-detroit-at-the-metropolitan-detroit" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/element-detroit-at-the-metropolitan-detroit.svg" alt="Element Detroit at the Metropolitan — Chrono Score, verified by HotelChrono" width="360" height="112"> </a>
More hotels in Detroit
Frequently asked
When was Element Detroit at the Metropolitan built?+
Element Detroit at the Metropolitan (Detroit, United States) was built in 2018.
How old is Element Detroit at the Metropolitan?+
Element Detroit at the Metropolitan is 8 years old — it was built in 2018 and last renovated in 2018. Age measures the building; the Chrono Score measures how fresh it feels today.
When was Element Detroit at the Metropolitan last renovated?+
Its most recent completed renovation was in 2018.
What is the Chrono Score of Element Detroit at the Metropolitan?+
Its Chrono Score is 7.2/10 (Ageing) — a pure freshness metric, separate from its 3-star rating.