DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby
Detroit, United States
Built 1916 · Last completed renovation 2023
DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby in Detroit was last renovated in 2023, and originally built in 1916 (sourced renovations: 2008, 2023). Its HotelChrono freshness score is 9.0/10 — every date linked to a cited source.
Renovation forecast · estimate
Next renovation expected around 2038
In about 12 years (≈15-year cycle). A model estimate, not a sourced fact.
Photo via Wikimedia Commons
Location
Satellite view · Detroit, United States
Timeline
1917
Original hotel construction
2008
Reopening as DoubleTree after restoration
2023
Renovation completed
How this score is computed
Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →
What changed in the 2023 renovation
“Year of Last Renovation: · 2023”— source · retrieved 2026-11-22
Scope is quoted verbatim from the cited source — we never guess what a renovation covered.
Facts
Built
Sourced1916
Last completed renovation
Sourced2023
Renovation history (sourced)
Sources record multiple renovations (2008–2023). The Chrono Score uses the most recent completed one.
Ownership & operator
Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.
Ownership data depth
1/3 · 33%
- ✓ Operating brand
- ○ Management / operator
- ○ Ownership
FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.
See the Renovation Radar →Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“Year of Last Renovation: · 2023”
“The hotel reopened as the 'DoubleTree Guest Suites by Hilton Detroit Downtown - Fort Shelby on December 15, 2008.”
“Schmidt, Garden & Martin constructed The Fort Shelby Hotel in 1917 boasting Beaux-Arts style, which cost $890,000 to build.”
“The building was built in two phases, with a 10-story hotel opening in 1916, designed by Chicago architects Schmidt, Garden, and Martin.”
Own or manage DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby?
Add your renovation date
Know its timeline. Now check the price.
You’ve seen when it was last renovated — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/doubletree-suites-by-hilton-hotel-detroit-downtown-fort-shelby-detroit" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/doubletree-suites-by-hilton-hotel-detroit-downtown-fort-shelby-detroit.svg" alt="DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby — Chrono Score, verified by HotelChrono" width="360" height="112"> </a>
More hotels in Detroit
Frequently asked
When was DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby built?+
DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby (Detroit, United States) was built in 1916.
How old is DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby?+
DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby is 110 years old — it was built in 1916 and last renovated in 2023. Age measures the building; the Chrono Score measures how fresh it feels today.
When was DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby last renovated?+
Its most recent completed renovation was in 2023.
What is the Chrono Score of DoubleTree Suites by Hilton Hotel Detroit Downtown - Fort Shelby?+
Its Chrono Score is 9.0/10 (Fresh) — a pure freshness metric.