Dusit
Dubai, United Arab Emirates
Built 2001 · Last renovation 2022
Renovation forecast · estimate
Likely due for renovation now
Past its typical ~4-year renovation cycle. A model estimate, not a sourced fact.

Photo via Wikimedia Commons
Location
Satellite view · Dubai, United Arab Emirates
Timeline
1998
Construction began
2001
Hotel opened/completed
2013
Renovation of Deluxe Rooms and Executive Suites
2014
Major renovation of 147 suites
2021
Benjarong restaurant redesign and reopening
2022
Repositioned as dry hotel, introduced NoLo non-alcoholic bar
⚖️ Star classification · United Arab Emirates
re-classified every 1 yearIn Dubai, the hotel classification licence is valid 1 year (renewable; up to 4 years on request). Each emirate runs its own system.
System: Dubai Dept. of Economy & Tourism (Decree 17/2013)
“The term of the Licence will be one (1) year, renewable for the same period… and up to four (4) years.”
Facts
Stars
5★
Built
2001
Last renovation
2022
Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“In 2022, the property was repositioned as a dry hotel and introduced NoLo, the first non-alcoholic bar in Dubai.”
“the Benjarong restaurant, which reopened in 2021 following renovations.”
“In 2014, the hotel completed a major renovation of 147 suites.”
“After the renovation of the hotel's Deluxe Rooms and Executive Suites in 2013”
“Construction of the Dusit Thani Dubai began in 1998 and was completed in 2001.”
“Construction of the Dusit Thani Dubai began in 1998”
Know its timeline. Now check the price.
You've seen when it was renovated — book with confidence.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your verified freshness and link guests to your full timeline. Free — just paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/dusit-dubai" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/dusit-dubai.svg" alt="Dusit — Chrono Score by HotelChrono" width="240" height="72"> </a>
More hotels in Dubai
Frequently asked
When was Dusit built?+
Dusit (Dubai, United Arab Emirates) was built in 2001.
When was Dusit last renovated?+
Its most recent renovation was in 2022.
What is the Chrono Score of Dusit?+
Its Chrono Score is 7.2/10 (Ageing) — a pure freshness metric, separate from its 5-star rating.