LIVE DATA · sourced from the web
Open

Congress Plaza Hotel

Chicago, United States

Built 1893 · Last completed renovation 1950

Check availability →May be an affiliate link.

Congress Plaza Hotel in Chicago was last renovated in 1950, and originally built in 1893 (sourced renovations: 1907, 1950). Its HotelChrono freshness score is 0.5/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 23 Nov 2026How we verify →Report an error

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →
Congress Plaza Hotel, Chicago

Photo via Wikimedia Commons

Location

Satellite view · Chicago, United States

Timeline

  1. 1893

    Hotel opened as Auditorium Annex for World's Columbian Exposition

  2. 1907

    Major expansion and renovation

  3. 1950

    Pick Hotel Corporation renovation of entire hotel

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 1950
100 − 3.5 × 76 years = -166 → clamped to 5
= 0.5 / 10 · Tired

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 1950 renovation

Pick Hotel Corporation renovation of entire hotel
“In 1950, the Pick Hotel Corporation bought the hotel and oversaw a major renovation of the entire hotel, which included new suites and restaurants.”— source · retrieved 2026-11-23

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Built

Sourced

1893

Last completed renovation

Sourced

1950

Renovation history (sourced)

1907·1950

Sources record multiple renovations (1907–1950). The Chrono Score uses the most recent completed one.

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Reference (Wikipedia) · Renovation 1950weight 0.65 · retrieved 2026-11-23view source →

“In 1950, the Pick Hotel Corporation bought the hotel and oversaw a major renovation of the entire hotel, which included new suites and restaurants.”

Reference (Wikipedia) · Renovation 1907weight 0.65 · retrieved 2026-11-23view source →

“The hotel had two major expansions and renovations, first in 1902 and then again in 1907.”

Secondary · Built 1893weight 0.70 · retrieved 2026-11-23view source →

“The Congress Plaza Hotel, opened in 1893 for the World's Fair, has hosted presidents, celebrities, and gangsters including Al Capone.”

Own or manage Congress Plaza Hotel?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/congress-plaza-hotel-chicago" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/congress-plaza-hotel-chicago.svg" alt="Congress Plaza Hotel — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Chicago

All hotels in Chicago →

Frequently asked

When was Congress Plaza Hotel built?+

Congress Plaza Hotel (Chicago, United States) was built in 1893.

How old is Congress Plaza Hotel?+

Congress Plaza Hotel is 133 years old — it was built in 1893 and last renovated in 1950. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Congress Plaza Hotel last renovated?+

Its most recent completed renovation was in 1950.

What is the Chrono Score of Congress Plaza Hotel?+

Its Chrono Score is 0.5/10 (Tired) — a pure freshness metric.

Explore hotels by renovation status