LIVE DATA · sourced from the web
★★★Open

Courtyard Chicago Downtown/River North

Chicago, United States

Built 2010 · Last completed renovation 2025

↻ Brand/operator transition signalled — may reopen under new management

Courtyard Chicago Downtown/River North in Chicago was last renovated in 2025, and originally built in 2010. Its HotelChrono freshness score is 9.7/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 13 Aug 2026How we verify →Report an error

Data check

  • · Brand/operator transition signalled — may reopen under new management
  • · Sources disagree on the opening year — under review

Renovation forecast · estimate

Next renovation expected around 2033

In about 7 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Chicago, United States

Timeline

  1. 1927

    Historic Fisk Building constructed

  2. 2010

    Converted to Courtyard by Marriott hotel

  3. 2011

    Rehabilitation/adaptive reuse completed; hotel opens as 107-room Courtyard by Ma

  4. 2025

    Hotel sold to KAMP Hotels (affiliate) from Summit Hotel Properties

  5. 2025

    Renovation completed

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2025
100 − 3.5 × 1 year = 97
= 9.7 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2025 renovation

Hotel sold to KAMP Hotels (affiliate) from Summit Hotel PropertiesRenovation completed
An affiliate of Summit Hotel Properties, Inc., sold the hotel to an affiliate of Amarillo-based KAMP Hotels on October 20, 2025.source · retrieved 2026-08-13
The Fisk Building was rehabilitated in 2011 as a 107-room hotel, the largest private investment in the downtown in forty years, and a federal historic tax credit project.source · retrieved 2026-08-13

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

3★

Built

Sourced

2010

Last completed renovation

Sourced

2025

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

0/3 · 0%

  • Operating brand
  • Management / operator
  • Ownership

Signal

Brand / operator transition

A rebrand or new operator may be underway — verify current management before contact.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Rebrand 2025weight 0.70 · retrieved 2026-08-13view source →

An affiliate of Summit Hotel Properties, Inc., sold the hotel to an affiliate of Amarillo-based KAMP Hotels on October 20, 2025.

Secondary · Full renovation 2025weight 0.70 · retrieved 2026-08-13view source →

The Fisk Building was rehabilitated in 2011 as a 107-room hotel, the largest private investment in the downtown in forty years, and a federal historic tax credit project.

Secondary · Built 2011weight 0.70 · retrieved 2026-08-13view source →

The Fisk Building was rehabilitated in 2011 as a 107-room hotel, the largest private investment in the downtown in forty years, and a federal historic tax credit project.

Secondary · conversion 2010weight 0.70 · retrieved 2026-08-13view source →

The Courtyard Amarillo Downtown, originally built in 1928 and converted to a hotel in 2010, includes a business area, a fitness center, and The Bistro, which serves breakfast and dinner.

Secondary · Built 1927weight 0.70 · retrieved 2026-08-13view source →

The 11-story Fisk Building has been in Amarillo since 1927. It was designed by noted local architect Guy Carlander and for years served as a medical professional building.

Own or manage Courtyard Chicago Downtown/River North?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/courtyard-chicago-downtown-river-north-chicago" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/courtyard-chicago-downtown-river-north-chicago.svg" alt="Courtyard Chicago Downtown/River North — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Chicago

All hotels in Chicago

Frequently asked

When was Courtyard Chicago Downtown/River North built?+

Courtyard Chicago Downtown/River North (Chicago, United States) was built in 2010.

How old is Courtyard Chicago Downtown/River North?+

Courtyard Chicago Downtown/River North is 16 years old — it was built in 2010 and last renovated in 2025. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Courtyard Chicago Downtown/River North last renovated?+

Its most recent completed renovation was in 2025.

What is the Chrono Score of Courtyard Chicago Downtown/River North?+

Its Chrono Score is 9.7/10 (Fresh) — a pure freshness metric, separate from its 3-star rating.

Explore hotels by renovation status