LIVE DATA · sourced from the web
★★★★★Open

Wish Hotel da Bahia (Hotel da Bahia by Wish)

Salvador, Brazil

Built 1952 · Last completed renovation 2025

Wish Hotel da Bahia (Hotel da Bahia by Wish) in Salvador was last renovated in 2025, and originally built in 1952 (sourced renovations: 2013, 2025). Its HotelChrono freshness score is 9.7/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 27 Sept 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2037

In about 11 years (≈12-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Salvador, Brazil

Timeline

  1. 1952

    Hotel opens as Salvador's first five-star hotel

  2. 2010

    Hotel closed and acquired by GJP Hotels for renovation

  3. 2013

    Three-year renovation completed, hotel reopens under Sheraton/GJP

  4. 2018

    Property commercially renamed Wish Hotel da Bahia

  5. 2025

    Renovation completed

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2025
100 − 3.5 × 1 year = 97
= 9.7 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2025 renovation

Renovation completed
“Nesta primeira etapa, foram entregues o retrofit completo do Centro de Eventos, com capacidade para até 1.500 pessoas distribuídas em 13 salas, e a reforma dos apartamentos do 11º andar, com 35 acomodações totalmente renovadas.”— source · retrieved 2026-09-27

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

5★

Built

Sourced

1952

Last completed renovation

Sourced

2025

Renovation history (sourced)

2013·2025

Sources record multiple renovations (2013–2025). The Chrono Score uses the most recent completed one.

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Full renovation 2025weight 0.70 · retrieved 2026-09-27view source →

“Nesta primeira etapa, foram entregues o retrofit completo do Centro de Eventos, com capacidade para até 1.500 pessoas distribuídas em 13 salas, e a reforma dos apartamentos do 11º andar, com 35 acomodações totalmente renovadas.”

Reference (Wikipedia) · Rebrand 2018weight 0.65 · retrieved 2026-09-27view source →

“Desde 2018 é comercialmente chamado de Wish Hotel da Bah”

Reference (Wikipedia) · Full renovation 2013weight 0.65 · retrieved 2026-09-27view source →

“Durou três anos a reforma, sendo reaberto em 2013.”

Reference (Wikipedia) · closure 2010weight 0.65 · retrieved 2026-09-27view source →

“Em fevereiro de 2010 foi fechado novamente e em abril do mesmo ano, o hotel foi adquirido pelo Grupo GJP Hotels em leilão, que aportou em torno de cem milhões para sua compra.”

Secondary · Built 1952weight 0.70 · retrieved 2026-09-27view source →

“o governador da Bahia na época, Octávio Mangabeira, implementou a construção do hotel — que foi inaugurado dia 24 de maio de 1952.”

Own or manage Wish Hotel da Bahia (Hotel da Bahia by Wish)?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/wish-hotel-da-bahia-hotel-da-bahia-by-wish-salvador" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/wish-hotel-da-bahia-hotel-da-bahia-by-wish-salvador.svg" alt="Wish Hotel da Bahia (Hotel da Bahia by Wish) — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

Frequently asked

When was Wish Hotel da Bahia (Hotel da Bahia by Wish) built?+

Wish Hotel da Bahia (Hotel da Bahia by Wish) (Salvador, Brazil) was built in 1952.

How old is Wish Hotel da Bahia (Hotel da Bahia by Wish)?+

Wish Hotel da Bahia (Hotel da Bahia by Wish) is 74 years old — it was built in 1952 and last renovated in 2025. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Wish Hotel da Bahia (Hotel da Bahia by Wish) last renovated?+

Its most recent completed renovation was in 2025.

What is the Chrono Score of Wish Hotel da Bahia (Hotel da Bahia by Wish)?+

Its Chrono Score is 9.7/10 (Fresh) — a pure freshness metric, separate from its 5-star rating.

Explore hotels by renovation status