LIVE DATA · sourced from the web
★★★★Open

The Zetter Bloomsbury

London, United Kingdom

Built 2026 · Last completed renovation 2026

The Zetter Bloomsbury in London was last renovated in 2026, and originally built in 2026. Its HotelChrono freshness score is 9.9/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedHigh confidenceLast verified: 16 Sept 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2034

In about 8 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · London, United Kingdom

Timeline

  1. 2026

    The Zetter Bloomsbury opened in March/April 2026

  2. 2026

    Completed four-year renovation of six Georgian townhouses

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2026
100 − 3.5 × 0 years = 100 → clamped to 99
= 9.9 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2026 renovation

Completed four-year renovation of six Georgian townhouses
This hotel is closed for renovation and plans to reopen January 2026.source · retrieved 2026-09-16
The Zetter Group will expand its celebrated London portfolio with the opening of The Zetter Bloomsbury in March 2026.source · retrieved 2026-09-16

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Built

Sourced

2026

Last completed renovation

Sourced

2026

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · renovation 2026weight 0.70 · retrieved 2026-09-16view source →

This hotel is closed for renovation and plans to reopen January 2026.

Editorial · Built 2026weight 0.85 · retrieved 2026-09-16view source →

The Zetter Group will expand its celebrated London portfolio with the opening of The Zetter Bloomsbury in March 2026.

Secondary · Full renovation 2026weight 0.70 · retrieved 2026-09-16view source →

who led the Zetter's four-year renovation project.

Secondary · builtweight 0.70 · retrieved 2026-09-16view source →

In early 2026, The Zetter Group will expand its celebrated London portfolio with the opening of The Zetter Bloomsbury — a 68-bedroom townhouse hotel set across six interconnecting Georgian buildings on Montague Street, directly opposite the British Museum.

Own or manage The Zetter Bloomsbury?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/the-zetter-bloomsbury-london" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/the-zetter-bloomsbury-london.svg" alt="The Zetter Bloomsbury — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in London

All hotels in London

Frequently asked

When was The Zetter Bloomsbury built?+

The Zetter Bloomsbury (London, United Kingdom) was built in 2026.

How old is The Zetter Bloomsbury?+

The Zetter Bloomsbury is 0 years old — it was built in 2026 and last renovated in 2026. Age measures the building; the Chrono Score measures how fresh it feels today.

When was The Zetter Bloomsbury last renovated?+

Its most recent completed renovation was in 2026.

What is the Chrono Score of The Zetter Bloomsbury?+

Its Chrono Score is 9.9/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status