The Slow Canggu
Canggu, Indonesia
Built 2016 · Last completed renovation 2023
The Slow Canggu in Canggu was last renovated in 2023, and originally built in 2016. Its HotelChrono freshness score is 9.0/10 — every date linked to a cited source.
Renovation forecast · estimate
Next renovation expected around 2031
In about 5 years (≈8-year cycle). A model estimate, not a sourced fact.
Location
Satellite view · Canggu, Indonesia
Timeline
2016
Hotel opening
2023
Most recent renovation
How this score is computed
Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →
What changed in the 2023 renovation
“Most recent renovation: 2023”— source · retrieved 2026-11-22
Scope is quoted verbatim from the cited source — we never guess what a renovation covered.
Facts
Stars
4★
Built
Sourced2016
Last completed renovation
Sourced2023
Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“Most recent renovation: 2023”
“Yet since opening in late 2016, the hotel has attracted both low-key surfers and artists drawn to its mix of haute- hippy, Tulum-esque vibes and 1970s LA surf culture.”
Own or manage The Slow Canggu?
Add your renovation date
Know its timeline. Now check the price.
You’ve seen when it was last renovated — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/the-slow-canggu-canggu" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/the-slow-canggu-canggu.svg" alt="The Slow Canggu — Chrono Score, verified by HotelChrono" width="360" height="112"> </a>
More hotels in Canggu
Frequently asked
When was The Slow Canggu built?+
The Slow Canggu (Canggu, Indonesia) was built in 2016.
How old is The Slow Canggu?+
The Slow Canggu is 10 years old — it was built in 2016 and last renovated in 2023. Age measures the building; the Chrono Score measures how fresh it feels today.
When was The Slow Canggu last renovated?+
Its most recent completed renovation was in 2023.
What is the Chrono Score of The Slow Canggu?+
Its Chrono Score is 9.0/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.