LIVE DATA · sourced from the web
★★★★★Open

The Sarova Stanley Hotel

Nairobi, Kenya

Built 1902 · Last completed renovation 1998

The Sarova Stanley Hotel in Nairobi was last renovated in 1998, and originally built in 1902 (sourced renovations: 1958, 1998). Its HotelChrono freshness score is 0.5/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 18 Sept 2026How we verify →Report an error

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →
The Sarova Stanley Hotel, Nairobi

Photo via Wikimedia Commons

Location

Satellite view · Nairobi, Kenya

Timeline

  1. 1958

    Structure torn down and rebuilt for expansion

  2. 1998

    $20 million renovation and name restoration

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 1998
100 − 3.5 × 28 years = 2 → clamped to 5
= 0.5 / 10 · Tired

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 1998 renovation

$20 million renovation and name restoration
The Sarova Group undertook a $20 million renovation of the hotel in 1998 and restored it’s original name, The Stanley Hotel.source · retrieved 2026-09-18

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

5★

Built

Sourced

1902

Last completed renovation

Sourced

1998

Renovation history (sourced)

1958·1998

Sources record multiple renovations (19581998). The Chrono Score uses the most recent completed one.

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 1998weight 0.70 · retrieved 2026-09-18view source →

The Sarova Group undertook a $20 million renovation of the hotel in 1998 and restored it’s original name, The Stanley Hotel.

Reference (Wikipedia) · Renovation 1958weight 0.65 · retrieved 2026-09-18view source →

In 1958, most of the hotel structure was torn down and rebuilt per Abraham Block's two sons' plans for expansion.

Own or manage The Sarova Stanley Hotel?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/the-sarova-stanley-hotel-nairobi" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/the-sarova-stanley-hotel-nairobi.svg" alt="The Sarova Stanley Hotel — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Nairobi

All hotels in Nairobi

Frequently asked

When was The Sarova Stanley Hotel built?+

The Sarova Stanley Hotel (Nairobi, Kenya) was built in 1902.

How old is The Sarova Stanley Hotel?+

The Sarova Stanley Hotel is 124 years old — it was built in 1902 and last renovated in 1998. Age measures the building; the Chrono Score measures how fresh it feels today.

When was The Sarova Stanley Hotel last renovated?+

Its most recent completed renovation was in 1998.

What is the Chrono Score of The Sarova Stanley Hotel?+

Its Chrono Score is 0.5/10 (Tired) — a pure freshness metric, separate from its 5-star rating.

Explore hotels by renovation status