LIVE DATA · sourced from the web
Open

The Dagny

Boston, United States

Built 1998 · Last completed renovation 2023

Check availability →May be an affiliate link.

The Dagny in Boston was last renovated in 2023, and originally built in 1998. Its HotelChrono freshness score is 9.0/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedHigh confidenceLast verified: 22 Nov 2026How we verify →Report an error

Data check

  • · Sources disagree on the opening year — under review

Renovation forecast · estimate

Next renovation expected around 2031

In about 5 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Boston, United States

Timeline

  1. 1928

    Original building (Batterymarch Building) completed

  2. 1998

    Building converted into a hotel

  3. 2023

    Hotel reopened as The Dagny after renovation

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2023
100 − 3.5 × 3 years = 90
= 9.0 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2023 renovation

Hotel reopened as The Dagny after renovation
“The entire hotel refreshed in a 2023 renovation blending classic comfort with contemporary style.”— source · retrieved 2026-11-22

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Built

Verified

1998

Last completed renovation

Sourced

2023

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 2023weight 0.70 · retrieved 2026-11-22view source →

“The entire hotel refreshed in a 2023 renovation blending classic comfort with contemporary style.”

Secondary · Built 1998weight 0.70 · retrieved 2026-11-22view source →

“In 1998, it became a hotel and the original gold leaf Art Deco mural of Atlas in its lobby ceiling has remained ever since.”

Secondary · Built 1928weight 0.70 · retrieved 2026-11-22view source →

“It became Boston’s first Art Deco skyscraper to define the city’s modern skyline when it was completed in 1928.”

Editorial · builtweight 0.85 · retrieved 2026-11-22view source →

“In 1998, the building was converted to a hotel as part of a preservation effort.”

Own or manage The Dagny?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/the-dagny-boston" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/the-dagny-boston.svg" alt="The Dagny — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Boston

All hotels in Boston →

Frequently asked

When was The Dagny built?+

The Dagny (Boston, United States) was built in 1998.

How old is The Dagny?+

The Dagny is 28 years old — it was built in 1998 and last renovated in 2023. Age measures the building; the Chrono Score measures how fresh it feels today.

When was The Dagny last renovated?+

Its most recent completed renovation was in 2023.

What is the Chrono Score of The Dagny?+

Its Chrono Score is 9.0/10 (Fresh) — a pure freshness metric.

Explore hotels by renovation status