Tataki
Santorini, Greece
Built — · Last completed renovation 2025
Data check
- · Based on a weak source — confidence capped until verified
Renovation forecast · estimate
Next renovation expected around 2033
In about 7 years (≈8-year cycle). A model estimate, not a sourced fact.
Location
Satellite view · Santorini, Greece
Timeline
2025
Renovation
⚖️ Star classification · Greece
re-classified every 5 yearsStar certificates from the Hellenic Chamber of Hotels are valid 5 years, then a re-inspection is mandatory (or sooner if the property changes).
System: Hellenic Chamber of Hotels (Law 4276/2014)
“The Classification Certificate is valid for 5 years and is subject to a re-inspection following the expiry date or whenever a change takes place that impacts the operational or technical characteristics.”
Facts
Stars
2★
Last completed renovation
2025
Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“Completely renovated in 2025, with great attention to detail.”
Know its timeline. Now check the price.
You’ve seen when it was renovated — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your verified freshness and link guests to your full timeline. Free — just paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/tataki-santorini" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/tataki-santorini.svg" alt="Tataki — Chrono Score by HotelChrono" width="240" height="72"> </a>
More hotels in Santorini
Frequently asked
When was Tataki built?+
We have not yet found a sourced build year for Tataki (Santorini, Greece).
When was Tataki last renovated?+
Its most recent completed renovation was in 2025.
What is the Chrono Score of Tataki?+
Its Chrono Score is 9.3/10 (Fresh) — a pure freshness metric, separate from its 2-star rating.