LIVE DATA · sourced from the web
Open

Sheraton Columbia Downtown Hotel

Columbia, United States

Built 2008

Sheraton Columbia Downtown Hotel in Columbia was built in 2008; no completed renovation is yet on record. Its HotelChrono freshness score is 7.3/10.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 13 Sept 2026How we verify →Report an error

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Columbia, United States

Timeline

  1. 2008

    Historic Palmetto Building (built 1912-1913, originally a bank) converted and op

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: built 2008, no completed renovation on record
100 − 1.5 × 18 years = 73
= 7.3 / 10 · Ageing

Every figure here traces back to the sourced build year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

Facts

Built

Sourced

2008

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • Operating brand
  • Management / operator
  • Ownership

Operating brand

Sheraton

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Built 2008weight 0.70 · retrieved 2026-09-13view source →

Originally built in 1913, the Palmetto Building was once a bank and even housed a hidden tavern during prohibition.

Secondary · builtweight 0.70 · retrieved 2026-09-13view source →

He began construction in 2006 and opened the 17-floor Sheraton in 2008.

Own or manage Sheraton Columbia Downtown Hotel?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it opened (2008) — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/sheraton-columbia-downtown-hotel-columbia" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/sheraton-columbia-downtown-hotel-columbia.svg" alt="Sheraton Columbia Downtown Hotel — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Columbia

All hotels in ColumbiaAll Sheraton hotels →

Frequently asked

When was Sheraton Columbia Downtown Hotel built?+

Sheraton Columbia Downtown Hotel (Columbia, United States) was built in 2008.

How old is Sheraton Columbia Downtown Hotel?+

Sheraton Columbia Downtown Hotel is 18 years old — it was built in 2008. Age measures the building; the Chrono Score measures how fresh it feels today.

Has Sheraton Columbia Downtown Hotel been renovated recently?+

We have not yet found a sourced completed renovation year for Sheraton Columbia Downtown Hotel.

What is the Chrono Score of Sheraton Columbia Downtown Hotel?+

Its Chrono Score is 7.3/10 (Ageing) — a pure freshness metric.

Explore hotels by renovation status