LIVE DATA · sourced from the web
★★★★Open

Renaissance Saint Elm Dallas Downtown Hotel

Dallas, United States

Built 2022

Check availability →May be an affiliate link.

Renaissance Saint Elm Dallas Downtown Hotel in Dallas was built in 2022; no completed renovation is yet on record. Its HotelChrono freshness score is 9.4/10.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 22 Nov 2026How we verify →Report an error

Data check

  • · Sources disagree on the opening year — under review

Renovation forecast · estimate

Next renovation expected around 2030

In about 4 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Dallas, United States

Timeline

  1. 1932

    Original Tower Petroleum Building constructed

  2. 2022

    Hotel opened in converted historic Tower Petroleum Building

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: built 2022, no completed renovation on record
100 − 1.5 × 4 years = 94
= 9.4 / 10 · Fresh

Every figure here traces back to the sourced build year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

Facts

Stars

4★

Built

Sourced

2022

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Renaissance

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Built 2022weight 0.70 · retrieved 2026-11-22view source →

“Dallas, TX – February 23, 2022 – Renaissance Saint Elm Dallas Downtown Hotel opens its doors on Friday, February 25, 2022.”

Secondary · Built 1932weight 0.70 · retrieved 2026-11-22view source →

“The new Renaissance Saint Elm is located in downtown Dallas's historic and storied Tower Petroleum Building, which originally opened in 1932 and was designed by renowned architect Mark Lemmon.”

Own or manage Renaissance Saint Elm Dallas Downtown Hotel?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it opened (2022) — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/renaissance-saint-elm-dallas-downtown-hotel-dallas" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/renaissance-saint-elm-dallas-downtown-hotel-dallas.svg" alt="Renaissance Saint Elm Dallas Downtown Hotel — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Dallas

All hotels in Dallas →All Renaissance hotels →

Frequently asked

When was Renaissance Saint Elm Dallas Downtown Hotel built?+

Renaissance Saint Elm Dallas Downtown Hotel (Dallas, United States) was built in 2022.

How old is Renaissance Saint Elm Dallas Downtown Hotel?+

Renaissance Saint Elm Dallas Downtown Hotel is 4 years old — it was built in 2022. Age measures the building; the Chrono Score measures how fresh it feels today.

Has Renaissance Saint Elm Dallas Downtown Hotel been renovated recently?+

We have not yet found a sourced completed renovation year for Renaissance Saint Elm Dallas Downtown Hotel.

What is the Chrono Score of Renaissance Saint Elm Dallas Downtown Hotel?+

Its Chrono Score is 9.4/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status