LIVE DATA · sourced from the web
★★★★★Under renovation

Pical Resort, Valamar Collection

Poreč, Croatia

Built 2026

🔒 Closed for renovation — expected reopening 2026 · freshness pending

Pical Resort, Valamar Collection in Poreč is currently under renovation, with reopening expected 2026. Its last completed renovation on record is not yet documented. HotelChrono Chrono Score: 9.9/10 (freshness pending).

HotelChronoSourced & VerifiedMedium confidenceLast verified: 24 Aug 2026How we verify →Report an error

Data check

  • · Closed for renovation — not currently bookable; current freshness pending reopening

Confidence by dimension

Renovation under way: ConfirmedReopening date: EstimatedCompletion verified: Pending

Renovation forecast · estimate

Next renovation expected around 2034

In about 8 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Timeline

  1. 2026

    Pical Resort officially opened

⚖️ Star classification · Croatia

Star ratings are issued by Croatia's Ministry of Tourism & Sport under the Hotels Rulebook (NN 56/16). Categorization is a government procedure; no fixed national renewal interval is published.

System: Ministry of Tourism & Sport (Pravilnik o razvrstavanju… NN 56/16)

view source →Reviewed Jun 2026Informational — verify with local authorities.

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: built 2026, no completed renovation on record
100 − 1.5 × 0 years = 100 → clamped to 99
= 9.9 / 10 · Fresh

Every figure here traces back to the sourced build year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

Facts

Stars

5★

Built

Sourced

2026

Renovation in progress

announced/started 2026

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • Operating brand
  • Management / operator
  • Ownership

Operating brand

Valamar

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · renovationweight 0.70 · retrieved 2026-08-24view source →

Marking Valamar's largest investment to-date (€200 million), the Pical Resort will open its doors in spring 2026.

Secondary · Built 2026weight 0.70 · retrieved 2026-08-24view source →

The first guests arrived in mid-March as part of the resort's 'Be the First' opening campaign

Secondary · builtweight 0.70 · retrieved 2026-08-24view source →

After more than 18 months of intensive construction, the new Pical Resort 5* has officially opened in Poreč, marking the most significant tourism investment in Croatia in recent years and a flagship project for Valamar Riviera. The first guests arrived in mid-March as part of the resort's 'Be the First' opening campaign.

Own or manage Pical Resort, Valamar Collection?

Add your renovation date

This hotel is closed for renovation.

Not currently bookable — reopening expected 2026. Check its status before planning.

Check reopening status →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/pical-resort-valamar-collection-pore" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/pical-resort-valamar-collection-pore.svg" alt="Pical Resort, Valamar Collection — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Poreč

All hotels in PorečAll Valamar hotels →

Frequently asked

When was Pical Resort, Valamar Collection built?+

Pical Resort, Valamar Collection (Poreč, Croatia) was built in 2026.

How old is Pical Resort, Valamar Collection?+

Pical Resort, Valamar Collection is 0 years old — it was built in 2026. Age measures the building; the Chrono Score measures how fresh it feels today.

Is Pical Resort, Valamar Collection being renovated?+

Pical Resort, Valamar Collection is currently under renovation (expected reopening 2026). Until the works are completed and verified, we do not count it as a completed renovation.

What is the Chrono Score of Pical Resort, Valamar Collection?+

Its Chrono Score is 9.9/10, but freshness is currently pending — Pical Resort, Valamar Collection is under renovation, so the score reflects its last completed state rather than the works in progress.

Explore hotels by renovation status