LIVE DATA · sourced from the web
★★★★Open

Peter

Sölden, Austria

Built · Last completed renovation 2008

HotelChronoSourced & VerifiedMedium confidenceLast verified: 23 Jun 2026How we verify →Report an error

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Sölden, Austria

Timeline

  1. 2008

    Renovation

⚖️ Star classification · Austria

Austria uses the Hotelstars Union system. A rating is valid for 3–6 years (5★ Superior: 3 years), after which re-classification is mandatory.

System: Hotelstars Union (WKO — Austrian Hotel Association)

view source →Reviewed Jun 2026Informational — verify with local authorities.

The rating has a limited validity of between three and six years and the classification procedure must be regularly repeated. For 5*Superior it is valid for three years.

Facts

Stars

4★

Last completed renovation

2008

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · renovationweight 0.70 · retrieved 2026-06-23view source →

Relax in our wellness oasis, newly built in summer 2008: bio sauna, Finnish sauna, aroma steam bath, mountain water fountain, infrared sauna, relaxation room, relax loungers, water beds and fitness room.

Know its timeline. Now check the price.

You’ve seen when it was renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your verified freshness and link guests to your full timeline. Free — just paste this where you want the badge.

Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/peter-solden" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/peter-solden.svg" alt="Peter — Chrono Score by HotelChrono" width="240" height="72">
</a>

More hotels in Sölden

All hotels in Sölden

Frequently asked

When was Peter built?+

We have not yet found a sourced build year for Peter (Sölden, Austria).

When was Peter last renovated?+

Its most recent completed renovation was in 2008.

What is the Chrono Score of Peter?+

Its Chrono Score is 0.5/10 (Tired) — a pure freshness metric, separate from its 4-star rating.