LIVE DATA · sourced from the web
★★★★Open

Mercure

Bregenz, Austria

Built 1986 · Last completed renovation 2019

HotelChronoSourced & VerifiedMedium confidenceLast verified: 23 Jun 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2027

In about 1 year (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Bregenz, Austria

Timeline

  1. 1986

    Built

  2. 2019

    Renovation

⚖️ Star classification · Austria

Austria uses the Hotelstars Union system. A rating is valid for 3–6 years (5★ Superior: 3 years), after which re-classification is mandatory.

System: Hotelstars Union (WKO — Austrian Hotel Association)

view source →Reviewed Jun 2026Informational — verify with local authorities.

The rating has a limited validity of between three and six years and the classification procedure must be regularly repeated. For 5*Superior it is valid for three years.

Facts

Stars

4★

Built

1986

Last completed renovation

2019

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · renovationweight 0.70 · retrieved 2026-06-23view source →

Originally a Mercure hotel, our grand transformation in 2019 infused the space with luxurious, modern elegance.

Secondary · builtweight 0.70 · retrieved 2026-06-23view source →

Since 1986, Grand Hotel Bregenz - MGallery has been a beacon of hospitality, modern comforts, and timeless elegance

Know its timeline. Now check the price.

You’ve seen when it was renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your verified freshness and link guests to your full timeline. Free — just paste this where you want the badge.

Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/mercure-bregenz" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/mercure-bregenz.svg" alt="Mercure — Chrono Score by HotelChrono" width="240" height="72">
</a>

More hotels in Bregenz

All hotels in Bregenz

Frequently asked

When was Mercure built?+

Mercure (Bregenz, Austria) was built in 1986.

When was Mercure last renovated?+

Its most recent completed renovation was in 2019.

What is the Chrono Score of Mercure?+

Its Chrono Score is 5.1/10 (Ageing) — a pure freshness metric, separate from its 4-star rating.