LIVE DATA · sourced from the web
★★★★★Under renovation

lebua at State Tower

Bangkok, Thailand

Built 2006 · Last completed renovation 2025

🔒 Closed for renovation — expected reopening 2026 · freshness pending

lebua at State Tower in Bangkok is currently under renovation, with reopening expected 2026. Its last completed renovation on record was in 2025. HotelChrono Chrono Score: 7.0/10 (freshness pending).

HotelChronoSourced & VerifiedMedium confidenceLast verified: 17 Sept 2026How we verify →Report an error

Data check

  • · Closed for renovation — not currently bookable; current freshness pending reopening

Confidence by dimension

Renovation under way: ConfirmedReopening date: EstimatedCompletion verified: Pending

Renovation forecast · estimate

Next renovation expected around 2033

In about 7 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →
lebua at State Tower, Bangkok

Photo via Wikimedia Commons

Location

Satellite view · Bangkok, Thailand

Timeline

  1. 2006

    Hotel opened

  2. 2025

    28 suites redesigned with earthy tones and sleek wood accents

  3. 2026

    Multi-phased renovation program including Tower Club Signature Collection, dinin

  4. 2026

    Additional culinary concepts and enhancements completion by end of 2026

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2025
100 − 3.5 × 1 year = 97 → clamped to 70
= 7.0 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2025 renovation

28 suites redesigned with earthy tones and sleek wood accents
In late 2025, 28 suites underwent a redesign with earthy tones and sleek wood accents.source · retrieved 2026-09-17

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

5★

Built

Sourced

2006

Swimming pools

Sourced

1

Last completed renovation

Sourced

2025

Renovation in progress

announced/started 2026

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · renovation_started 2026weight 0.70 · retrieved 2026-09-17view source →

Celebrating its 20th anniversary in 2026, lebua Bangkok is currently debuting a landmark renovation program that introduces newly redesigned suites, a revitalized wellness floor, and enhanced rooftop dining experiences.

Secondary · renovation_announced 2026weight 0.70 · retrieved 2026-09-17view source →

Several of these enhancements are already underway, with completion slated for the end of 2026.

Weak source · Renovation 2025weight 0.50 · retrieved 2026-09-17view source →

In late 2025, 28 suites underwent a redesign with earthy tones and sleek wood accents.

Reference (Wikipedia) · Built 2006weight 0.65 · retrieved 2026-09-17view source →

Opening: 2006

Own or manage lebua at State Tower?

Add your renovation date

This hotel is closed for renovation.

Not currently bookable — reopening expected 2026. Check its status before planning.

Check reopening status →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/lebua-at-state-tower-bangkok" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/lebua-at-state-tower-bangkok.svg" alt="lebua at State Tower — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Bangkok

All hotels in Bangkok

Frequently asked

When was lebua at State Tower built?+

lebua at State Tower (Bangkok, Thailand) was built in 2006.

How old is lebua at State Tower?+

lebua at State Tower is 20 years old — it was built in 2006 and last renovated in 2025. Age measures the building; the Chrono Score measures how fresh it feels today.

Is lebua at State Tower being renovated?+

lebua at State Tower is currently under renovation (expected reopening 2026). Until the works are completed and verified, we do not count it as a completed renovation; its last completed renovation was in 2025.

What is the Chrono Score of lebua at State Tower?+

Its Chrono Score is 7.0/10, but freshness is currently pending — lebua at State Tower is under renovation, so the score reflects its last completed state rather than the works in progress.

Explore hotels by renovation status