LIVE DATA · sourced from the web
Open

Kimpton Hotel Monaco Salt Lake City

Salt Lake City, United States

Built 1999 · Last completed renovation 2024

Check availability →May be an affiliate link.

Kimpton Hotel Monaco Salt Lake City in Salt Lake City was last renovated in 2024, and originally built in 1999 (sourced renovations: 2012, 2024). Its HotelChrono freshness score is 9.3/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 22 Nov 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2036

In about 10 years (≈12-year cycle). A model estimate, not a sourced fact.

Renovation Radar →
Kimpton Hotel Monaco Salt Lake City, Salt Lake City

Photo via Wikimedia Commons

Location

Satellite view · Salt Lake City, United States

Timeline

  1. 2012

    $5 million complete transformation

  2. 2023

    Top-to-bottom renovation announced

  3. 2024

    Renovation completed

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2024
100 − 3.5 × 2 years = 93
= 9.3 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2024 renovation

Renovation completed
“The upcoming hotel will join downtown Salt Lake City’s other Kimpton location, the 225-room Kimpton Hotel Monaco Salt Lake City that reopened in early 2024 after an extensive four-month renovation, per IHG.”— source · retrieved 2026-11-22

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Built

Sourced

1999

Last completed renovation

Sourced

2024

Renovation history (sourced)

2012·2024

Sources record multiple renovations (2012–2024). The Chrono Score uses the most recent completed one.

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Kimpton

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Full renovation 2024weight 0.70 · retrieved 2026-11-22view source →

“The upcoming hotel will join downtown Salt Lake City’s other Kimpton location, the 225-room Kimpton Hotel Monaco Salt Lake City that reopened in early 2024 after an extensive four-month renovation, per IHG.”

Secondary · renovation_started 2023weight 0.70 · retrieved 2026-11-22view source →

“The transformation, set to be completed in late summer 2023, will include a full re-haul of its public spaces, on-site meeting and event spaces, its 225 guest rooms and suites, and its admired on-site restaurant, Bambara, and cocktail bar, The Vault.”

Secondary · Renovation 2012weight 0.70 · retrieved 2026-11-22view source →

“SALT LAKE CITY, (September 19, 2012) – Kimpton’s Hotel Monaco Salt Lake City has recently undergone a $5 million complete transformation.”

Secondary · builtweight 0.70 · retrieved 2026-11-22view source →

“Originally opened in 1999, the Kimpton Hotel Monaco Salt Lake City was overdue for some cosmetic and structural changes to match this upbeat direction.”

Own or manage Kimpton Hotel Monaco Salt Lake City?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/kimpton-hotel-monaco-salt-lake-city-salt-lake-city" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/kimpton-hotel-monaco-salt-lake-city-salt-lake-city.svg" alt="Kimpton Hotel Monaco Salt Lake City — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Salt Lake City

All hotels in Salt Lake City →All Kimpton hotels →

Frequently asked

When was Kimpton Hotel Monaco Salt Lake City built?+

Kimpton Hotel Monaco Salt Lake City (Salt Lake City, United States) was built in 1999.

How old is Kimpton Hotel Monaco Salt Lake City?+

Kimpton Hotel Monaco Salt Lake City is 27 years old — it was built in 1999 and last renovated in 2024. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Kimpton Hotel Monaco Salt Lake City last renovated?+

Its most recent completed renovation was in 2024.

What is the Chrono Score of Kimpton Hotel Monaco Salt Lake City?+

Its Chrono Score is 9.3/10 (Fresh) — a pure freshness metric.

Explore hotels by renovation status