LIVE DATA · sourced from the web
Open

Kimpton Hotel Monaco Pittsburgh

Pittsburgh, United States

Built 2015 · Last completed renovation 2015

Check availability →May be an affiliate link.

Kimpton Hotel Monaco Pittsburgh in Pittsburgh was last renovated in 2015, and originally built in 2015. Its HotelChrono freshness score is 6.2/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 22 Nov 2026How we verify →Report an error

Data check

  • · Sources disagree on the opening year — under review

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Pittsburgh, United States

Timeline

  1. 1903

    Original building constructed

  2. 2015

    Historic office building converted into Kimpton hotel

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2015
100 − 3.5 × 11 years = 62
= 6.2 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2015 renovation

Historic office building converted into Kimpton hotel
“When the firm moved, Kimpton purchased the 9-story building and renovated it into a 248-room hotel that opened in 2015.”— source · retrieved 2026-11-22

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Built

Sourced

2015

Last completed renovation

Sourced

2015

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Kimpton

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 2015weight 0.70 · retrieved 2026-11-22view source →

“When the firm moved, Kimpton purchased the 9-story building and renovated it into a 248-room hotel that opened in 2015.”

Secondary · Built 1903weight 0.70 · retrieved 2026-11-22view source →

“Kimpton Hotel Monaco Pittsburgh might be shiny and new, but its history stretches back to 1903, when the iconic Beaux Arts-style James H. Reed building was constructed.”

Own or manage Kimpton Hotel Monaco Pittsburgh?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/kimpton-hotel-monaco-pittsburgh-pittsburgh" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/kimpton-hotel-monaco-pittsburgh-pittsburgh.svg" alt="Kimpton Hotel Monaco Pittsburgh — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Pittsburgh

All hotels in Pittsburgh →All Kimpton hotels →

Frequently asked

When was Kimpton Hotel Monaco Pittsburgh built?+

Kimpton Hotel Monaco Pittsburgh (Pittsburgh, United States) was built in 2015.

How old is Kimpton Hotel Monaco Pittsburgh?+

Kimpton Hotel Monaco Pittsburgh is 11 years old — it was built in 2015 and last renovated in 2015. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Kimpton Hotel Monaco Pittsburgh last renovated?+

Its most recent completed renovation was in 2015.

What is the Chrono Score of Kimpton Hotel Monaco Pittsburgh?+

Its Chrono Score is 6.2/10 (Ageing) — a pure freshness metric.

Explore hotels by renovation status