LIVE DATA · sourced from the web
★★★★Open

Hotel Zena Washington DC

Washington, D.C., United States

Built 1974 · Last completed renovation 2020

HotelChronoSourced & VerifiedMedium confidenceLast verified: 20 Jun 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2028

In about 2 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →
Hotel Zena Washington DC, Washington, D.C.

Photo via Wikimedia Commons

Location

Satellite view · Washington, D.C., United States

Timeline

  1. 1974

    Built

  2. 2020

    Renovation

Facts

Stars

4★

Built

1974

Last completed renovation

2020

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Reference (Wikipedia) · renovationweight 0.65 · retrieved 2026-06-20view source →

Viceroy Hotels & Resorts took over management in July 2019, and the hotel was renamed The Donovan while it underwent renovation, before being rebranded as Hotel Zena on October 8, 2020.

Reference (Wikipedia) · builtweight 0.65 · retrieved 2026-06-20view source →

The hotel opened in 1974 as the Quality Inn Downtown.

Know its timeline. Now check the price.

You’ve seen when it was renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your verified freshness and link guests to your full timeline. Free — just paste this where you want the badge.

Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-zena-washington-dc-washington-dc" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-zena-washington-dc-washington-dc.svg" alt="Hotel Zena Washington DC — Chrono Score by HotelChrono" width="240" height="72">
</a>

More hotels in Washington, D.C.

All hotels in Washington, D.C.

Frequently asked

When was Hotel Zena Washington DC built?+

Hotel Zena Washington DC (Washington, D.C., United States) was built in 1974.

When was Hotel Zena Washington DC last renovated?+

Its most recent completed renovation was in 2020.

What is the Chrono Score of Hotel Zena Washington DC?+

Its Chrono Score is 5.8/10 (Ageing) — a pure freshness metric, separate from its 4-star rating.