LIVE DATA · sourced from the web
★★★★Open

Hotel Valentin

Sölden, Austria

Built · Last completed renovation 2014

Hotel Valentin in Sölden was last renovated in 2014. Its HotelChrono freshness score is 5.8/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 23 Jun 2026How we verify →Report an error

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Sölden, Austria

Timeline

  1. 2014

    Full renovation completed in summer 2014

  2. 2017

    Valentin Apartments expansion opened (new apartment hotel property)

⚖️ Star classification · Austria

Austria uses the Hotelstars Union system. A rating is valid for 3–6 years (5★ Superior: 3 years), after which re-classification is mandatory.

System: Hotelstars Union (WKO — Austrian Hotel Association)

view source →Reviewed Jun 2026Informational — verify with local authorities.

The rating has a limited validity of between three and six years and the classification procedure must be regularly repeated. For 5*Superior it is valid for three years.

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2014
100 − 3.5 × 12 years = 58
= 5.8 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2014 renovation

Full renovation completed in summer 2014
Renovated in summer 2014, the Valentin Hotel features modern interior designsource · retrieved 2026-06-23

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Last completed renovation

Sourced

2014

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Expansion 2017weight 0.70 · retrieved 2026-06-23view source →

In December 2017, Hotel Valentin GmbH opened a new 4-star apartment hotel in Sölden

Secondary · Full renovation 2014weight 0.70 · retrieved 2026-06-23view source →

Renovated in summer 2014, the Valentin Hotel features modern interior design

Own or manage Hotel Valentin?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-valentin-solden" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-valentin-solden.svg" alt="Hotel Valentin — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Sölden

All hotels in Sölden

Frequently asked

When was Hotel Valentin built?+

We have not yet found a sourced build year for Hotel Valentin (Sölden, Austria).

How old is Hotel Valentin?+

We have not yet found a sourced build year for Hotel Valentin, so its exact age is unverified — but its renovation status and Chrono Score above still show how recent it feels.

When was Hotel Valentin last renovated?+

Its most recent completed renovation was in 2014.

What is the Chrono Score of Hotel Valentin?+

Its Chrono Score is 5.8/10 (Ageing) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status