LIVE DATA · sourced from the web
★★★★Open

Hotel Teatro

Denver, United States

Built 1999 · Last completed renovation 2019

Check availability →May be an affiliate link.

Hotel Teatro in Denver was last renovated in 2019, and originally built in 1999 (sourced renovations: 1999, 2014, 2019). Its HotelChrono freshness score is 7.6/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 22 Nov 2026How we verify →Report an error

Data check

  • · Sources disagree on the opening year — under review

Renovation forecast · estimate

Next renovation expected around 2029

In about 3 years (≈10-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Denver, United States

Timeline

  1. 1911

    Original Denver Tramway Building constructed

  2. 1999

    Building converted into Hotel Teatro

  3. 2014

    Lobby and first floor refresh by Studio Frank

  4. 2019

    Property-wide renovation

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2019
100 − 3.5 × 7 years = 76
= 7.6 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2019 renovation

Property-wide renovation
“Built 1911 Renovated 2019”— source · retrieved 2026-11-22

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Built

Sourced

1999

Last completed renovation

Sourced

2019

Renovation history (sourced)

1999·2014·2019

Sources record multiple renovations (1999–2019). The Chrono Score uses the most recent completed one.

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 2019weight 0.70 · retrieved 2026-11-22view source →

“Built 1911 Renovated 2019”

Secondary · Renovation 2014weight 0.70 · retrieved 2026-11-22view source →

“In 2014, Hotel Teatro refreshed its lobby and first floor with local designer Studio Frank, blending rustic and contemporary styles.”

Secondary · Renovation 1999weight 0.70 · retrieved 2026-11-22view source →

“After a significant rehabilitation, the landmark reappeared in 1999 as the 110-room Hotel Teatro.”

Secondary · Built 1911weight 0.70 · retrieved 2026-11-22view source →

“In 1911, two architects retained by Evans – William E. and Arthur A. Fisher– set out to design an eight-story office tower for the Denver Tramway Company and adjacent three-story car barn.”

Own or manage Hotel Teatro?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-teatro-denver" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-teatro-denver.svg" alt="Hotel Teatro — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Denver

All hotels in Denver →

Frequently asked

When was Hotel Teatro built?+

Hotel Teatro (Denver, United States) was built in 1999.

How old is Hotel Teatro?+

Hotel Teatro is 27 years old — it was built in 1999 and last renovated in 2019. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Hotel Teatro last renovated?+

Its most recent completed renovation was in 2019.

What is the Chrono Score of Hotel Teatro?+

Its Chrono Score is 7.6/10 (Ageing) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status