Hotel Santa Faz
Benidorm, Spain
Built 1956 · Last completed renovation 1999
Hotel Santa Faz in Benidorm was last renovated in 1999, and originally built in 1956. Its HotelChrono freshness score is 0.6/10 — every date linked to a cited source.
Renovation forecast · estimate
Likely due for renovation now
Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.
Location
Satellite view · Benidorm, Spain
Timeline
1999
Renovation completed
How this score is computed
Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →
What changed in the 1999 renovation
“Year of last partial refurbishment: 1999”— source · retrieved 2026-06-20
Scope is quoted verbatim from the cited source — we never guess what a renovation covered.
Facts
Stars
2★
Built
Sourced1956
Last completed renovation
Sourced1999
Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“Year of last partial refurbishment: 1999”
“This hotel, which was founded in 1956 in an old mansion, offers personalised treatment.”
Own or manage Hotel Santa Faz?
Add your renovation date
Know its timeline. Now check the price.
You’ve seen when it was last renovated — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/hotel-santa-faz-benidorm" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/hotel-santa-faz-benidorm.svg" alt="Hotel Santa Faz — Chrono Score, verified by HotelChrono" width="360" height="112"> </a>
More hotels in Benidorm
Frequently asked
When was Hotel Santa Faz built?+
Hotel Santa Faz (Benidorm, Spain) was built in 1956.
How old is Hotel Santa Faz?+
Hotel Santa Faz is 70 years old — it was built in 1956 and last renovated in 1999. Age measures the building; the Chrono Score measures how fresh it feels today.
When was Hotel Santa Faz last renovated?+
Its most recent completed renovation was in 1999.
What is the Chrono Score of Hotel Santa Faz?+
Its Chrono Score is 0.6/10 (Tired) — a pure freshness metric, separate from its 2-star rating.