LIVE DATA · sourced from the web
★★★Open

Hotel Royal

Poznań, Poland

Built 1905 · Last completed renovation 2002

Hotel Royal in Poznań was last renovated in 2002, and originally built in 1905 (sourced renovations: 1918, 1992, 2002). Its HotelChrono freshness score is 1.6/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 17 Aug 2026How we verify →Report an error

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Poznań, Poland

Timeline

  1. 1918

    Served as army HQ during the Wielkopolska Uprising

  2. 1992

    Hotel returned to lawful successors and original name restored

  3. 2002

    Annual meetings began on anniversary of Greater Poland Uprising

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2002
100 − 3.5 × 24 years = 16
= 1.6 / 10 · Tired

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2002 renovation

Annual meetings began on anniversary of Greater Poland Uprising
Since 2002, annual meetings have been held on the occasion of the anniversary of the Greater Poland Uprising.source · retrieved 2026-08-17

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

3★

Built

Sourced

1905

Last completed renovation

Sourced

2002

Renovation history (sourced)

1918·1992·2002

Sources record multiple renovations (19182002). The Chrono Score uses the most recent completed one.

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 2002weight 0.70 · retrieved 2026-08-17view source →

Since 2002, annual meetings have been held on the occasion of the anniversary of the Greater Poland Uprising.

Secondary · Renovation 1992weight 0.70 · retrieved 2026-08-17view source →

The hotel happily returned to the hands of the lawful successors in late 1992, and its original name was restored two years later.

Secondary · Renovation 1918weight 0.70 · retrieved 2026-08-17view source →

Having served as army HQ during the 1918 Wielkopolska Uprising, Royal is tastefully decorated with wood panelling, floral flourishes, and plum and lavender schemes.

Secondary · builtweight 0.70 · retrieved 2026-08-17view source →

Hotel Royal started in 1905 as a small hotel run by a patriotic Polish family.

Own or manage Hotel Royal?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-royal-poznan" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-royal-poznan.svg" alt="Hotel Royal — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Poznań

All hotels in Poznań

Frequently asked

When was Hotel Royal built?+

Hotel Royal (Poznań, Poland) was built in 1905.

How old is Hotel Royal?+

Hotel Royal is 121 years old — it was built in 1905 and last renovated in 2002. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Hotel Royal last renovated?+

Its most recent completed renovation was in 2002.

What is the Chrono Score of Hotel Royal?+

Its Chrono Score is 1.6/10 (Tired) — a pure freshness metric, separate from its 3-star rating.

Explore hotels by renovation status