Hotel Royal
Poznań, Poland
Built 1905 · Last completed renovation 2002
Hotel Royal in Poznań was last renovated in 2002, and originally built in 1905 (sourced renovations: 1918, 1992, 2002). Its HotelChrono freshness score is 1.6/10 — every date linked to a cited source.
Renovation forecast · estimate
Likely due for renovation now
Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.
Location
Satellite view · Poznań, Poland
Timeline
1918
Served as army HQ during the Wielkopolska Uprising
1992
Hotel returned to lawful successors and original name restored
2002
Annual meetings began on anniversary of Greater Poland Uprising
How this score is computed
Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →
What changed in the 2002 renovation
“Since 2002, annual meetings have been held on the occasion of the anniversary of the Greater Poland Uprising.”— source · retrieved 2026-08-17
Scope is quoted verbatim from the cited source — we never guess what a renovation covered.
Facts
Stars
3★
Built
Sourced1905
Last completed renovation
Sourced2002
Renovation history (sourced)
Sources record multiple renovations (1918–2002). The Chrono Score uses the most recent completed one.
Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“Since 2002, annual meetings have been held on the occasion of the anniversary of the Greater Poland Uprising.”
“The hotel happily returned to the hands of the lawful successors in late 1992, and its original name was restored two years later.”
“Having served as army HQ during the 1918 Wielkopolska Uprising, Royal is tastefully decorated with wood panelling, floral flourishes, and plum and lavender schemes.”
“Hotel Royal started in 1905 as a small hotel run by a patriotic Polish family.”
Own or manage Hotel Royal?
Add your renovation date
Know its timeline. Now check the price.
You’ve seen when it was last renovated — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/hotel-royal-poznan" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/hotel-royal-poznan.svg" alt="Hotel Royal — Chrono Score, verified by HotelChrono" width="360" height="112"> </a>
More hotels in Poznań
All hotels in Poznań →Frequently asked
When was Hotel Royal built?+
Hotel Royal (Poznań, Poland) was built in 1905.
How old is Hotel Royal?+
Hotel Royal is 121 years old — it was built in 1905 and last renovated in 2002. Age measures the building; the Chrono Score measures how fresh it feels today.
When was Hotel Royal last renovated?+
Its most recent completed renovation was in 2002.
What is the Chrono Score of Hotel Royal?+
Its Chrono Score is 1.6/10 (Tired) — a pure freshness metric, separate from its 3-star rating.