LIVE DATA · sourced from the web
★★★Open

Hotel Olympic

Heraklion, Greece

Built 1969 · Last completed renovation 2018

Hotel Olympic in Heraklion was last renovated in 2018, and originally built in 1969. Its HotelChrono freshness score is 7.2/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedLow confidenceLast verified: 20 Jun 2026How we verify →Report an error

Data check

  • · Based on a weak source — confidence capped until verified

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Heraklion, Greece

Timeline

  1. 2018

    Renovation completed

⚖️ Star classification · Greece

re-classified every 5 years

Star certificates from the Hellenic Chamber of Hotels are valid 5 years, then a re-inspection is mandatory (or sooner if the property changes).

System: Hellenic Chamber of Hotels (Law 4276/2014)

view source →Reviewed Jun 2026Informational — verify with local authorities.

The Classification Certificate is valid for 5 years and is subject to a re-inspection following the expiry date or whenever a change takes place that impacts the operational or technical characteristics.

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2018
100 − 3.5 × 8 years = 72
= 7.2 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2018 renovation

Renovation completed
in 2018 the reception area and the main restaurant were fully renovatedsource · retrieved 2026-06-20

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

3★

Built

Sourced

1969

Last completed renovation

Sourced

2018

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Weak source · Full renovation 2018weight 0.50 · retrieved 2026-06-20view source →

in 2018 the reception area and the main restaurant were fully renovated

Own or manage Hotel Olympic?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-olympic-heraklion" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-olympic-heraklion.svg" alt="Hotel Olympic — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Heraklion

All hotels in Heraklion

Frequently asked

When was Hotel Olympic built?+

Hotel Olympic (Heraklion, Greece) was built in 1969.

How old is Hotel Olympic?+

Hotel Olympic is 57 years old — it was built in 1969 and last renovated in 2018. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Hotel Olympic last renovated?+

Its most recent completed renovation was in 2018.

What is the Chrono Score of Hotel Olympic?+

Its Chrono Score is 7.2/10 (Ageing) — a pure freshness metric, separate from its 3-star rating.

Explore hotels by renovation status