LIVE DATA · sourced from the web
★★★★Open

Hotel Monte Triana

Seville, Spain

Built 1990 · Last completed renovation 2021

Hotel Monte Triana in Seville was last renovated in 2021, and originally built in 1990 (sourced renovations: 2003, 2012, 2017, 2021). Its HotelChrono freshness score is 8.3/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 12 Sept 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2027

In about 1 year (≈6-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Seville, Spain

Timeline

  1. 2003

    Renovation of 34-room property

  2. 2012

    Last complete renovation

  3. 2017

    Last partial renovation

  4. 2021

    Rooms fully renovated

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2021
100 − 3.5 × 5 years = 83
= 8.3 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2021 renovation

Rooms fully renovated
It has 110 spacious rooms (doubles with king size beds, with two beds and Junior suites) with wooden floors, all renovated in 2021.source · retrieved 2026-09-12
It has 110 spacious rooms (doubles with king size beds, with two beds and Junior suites) with wooden floors, all renovated in 2021.source · retrieved 2026-09-12

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Built

Sourced

1990

Last completed renovation

Sourced

2021

Renovation history (sourced)

2003·2012·2017·2021

Sources record multiple renovations (20032021). The Chrono Score uses the most recent completed one.

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Weak source · renovation 2021weight 0.50 · retrieved 2026-09-12view source →

It has 110 spacious rooms (doubles with king size beds, with two beds and Junior suites) with wooden floors, all renovated in 2021.

Secondary · Renovation 2021weight 0.70 · retrieved 2026-09-12view source →

It has 110 spacious rooms (doubles with king size beds, with two beds and Junior suites) with wooden floors, all renovated in 2021.

Secondary · Renovation 2017weight 0.70 · retrieved 2026-09-12view source →

Hotel built in 1990, Last complete renovation 2012, Last partial renovation 2017

Secondary · Renovation 2012weight 0.70 · retrieved 2026-09-12view source →

Hotel built in 1990, Last complete renovation 2012, Last partial renovation 2017

Secondary · Renovation 2003weight 0.70 · retrieved 2026-09-12view source →

This 34 room property, renovated in 2003...

Own or manage Hotel Monte Triana?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-monte-triana-seville" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-monte-triana-seville.svg" alt="Hotel Monte Triana — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Seville

All hotels in Seville

Frequently asked

When was Hotel Monte Triana built?+

Hotel Monte Triana (Seville, Spain) was built in 1990.

How old is Hotel Monte Triana?+

Hotel Monte Triana is 36 years old — it was built in 1990 and last renovated in 2021. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Hotel Monte Triana last renovated?+

Its most recent completed renovation was in 2021.

What is the Chrono Score of Hotel Monte Triana?+

Its Chrono Score is 8.3/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status