Hotel Meliã
Genoa, Italy
Built 1929 · Last completed renovation 2007
Hotel Meliã in Genoa was last renovated in 2007, and originally built in 1929. Its HotelChrono freshness score is 3.4/10 — every date linked to a cited source.
Renovation forecast · estimate
Likely due for renovation now
Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.
Location
Satellite view · Genoa, Italy
Timeline
2007
Renovation completed
How this score is computed
Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →
What changed in the 2007 renovation
“Construction date 1929 · Year of renovation 2007”— source · retrieved 2026-06-23
Scope is quoted verbatim from the cited source — we never guess what a renovation covered.
Facts
Stars
5★
Built
Sourced1929
Last completed renovation
Sourced2007
Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“Construction date 1929 · Year of renovation 2007”
“Built in 1929 and designed by Guiseppe Crosa di Vergnani, this building has served as the headquarters for an iron and steel manufacturing company.”
Own or manage Hotel Meliã?
Add your renovation date
Know its timeline. Now check the price.
You’ve seen when it was last renovated — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/hotel-meli-genoa" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/hotel-meli-genoa.svg" alt="Hotel Meliã — Chrono Score, verified by HotelChrono" width="360" height="112"> </a>
More hotels in Genoa
Frequently asked
When was Hotel Meliã built?+
Hotel Meliã (Genoa, Italy) was built in 1929.
How old is Hotel Meliã?+
Hotel Meliã is 97 years old — it was built in 1929 and last renovated in 2007. Age measures the building; the Chrono Score measures how fresh it feels today.
When was Hotel Meliã last renovated?+
Its most recent completed renovation was in 2007.
What is the Chrono Score of Hotel Meliã?+
Its Chrono Score is 3.4/10 (Tired) — a pure freshness metric, separate from its 5-star rating.