LIVE DATA · sourced from the web
★★★★★Open

Hôtel Manali

Courchevel, France

Built 2007 · Last completed renovation 2019

Hôtel Manali in Courchevel was last renovated in 2019, and originally built in 2007. Its HotelChrono freshness score is 7.6/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 9 Sept 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2027

In about 1 year (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Courchevel, France

Timeline

  1. 2007

    Hotel opened

  2. 2019

    Converted into luxury apartment lodge and reopened

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2019
100 − 3.5 × 7 years = 76
= 7.6 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2019 renovation

Converted into luxury apartment lodge and reopened
In January 2019, the Alpine Collection group acquired the premises, giving the establishment a new lease of life and preserving its architecture and visual identity. At the Manali, the 38 hotel rooms were turned into 18 luxury suites, each of which is unique and features its own interior. The new Manali Lodge was inaugurated in December 2019.source · retrieved 2026-09-09

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

5★

Built

Sourced

2007

Last completed renovation

Sourced

2019

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 2019weight 0.70 · retrieved 2026-09-09view source →

In January 2019, the Alpine Collection group acquired the premises, giving the establishment a new lease of life and preserving its architecture and visual identity. At the Manali, the 38 hotel rooms were turned into 18 luxury suites, each of which is unique and features its own interior. The new Manali Lodge was inaugurated in December 2019.

Secondary · Built 2007weight 0.70 · retrieved 2026-09-09view source →

Built in 2007, the Manali was born out of the shared passion for high-altitude destinations, especially the Himalayas, of a man of the mountains and a businessman.

Own or manage Hôtel Manali?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-manali-courchevel" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-manali-courchevel.svg" alt="Hôtel Manali — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Courchevel

All hotels in Courchevel

Frequently asked

When was Hôtel Manali built?+

Hôtel Manali (Courchevel, France) was built in 2007.

How old is Hôtel Manali?+

Hôtel Manali is 19 years old — it was built in 2007 and last renovated in 2019. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Hôtel Manali last renovated?+

Its most recent completed renovation was in 2019.

What is the Chrono Score of Hôtel Manali?+

Its Chrono Score is 7.6/10 (Ageing) — a pure freshness metric, separate from its 5-star rating.

Explore hotels by renovation status