LIVE DATA · sourced from the web
★★★★Open

Hotel Kornock

Stadl-Predlitz, Austria

Built — · Last completed renovation 2019

Check availability →May be an affiliate link.

Hotel Kornock in Stadl-Predlitz was last renovated in 2019. Its HotelChrono freshness score is 7.6/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 14 Nov 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2027

In about 1 year (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Stadl-Predlitz, Austria

Timeline

  1. 2019

    Complete renovation of the hotel

⚖️ Star classification · Austria

Austria uses the Hotelstars Union system. A rating is valid for 3–6 years (5★ Superior: 3 years), after which re-classification is mandatory.

System: Hotelstars Union (WKO — Austrian Hotel Association)

view source →Reviewed Jun 2026Informational — verify with local authorities.

“The rating has a limited validity of between three and six years and the classification procedure must be regularly repeated. For 5*Superior it is valid for three years.”

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2019
100 − 3.5 × 7 years = 76
= 7.6 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2019 renovation

Complete renovation of the hotel
“We completely renovated our hotel in 2019 with great attention to light and furnishing details and turned it into a 360° hotel on the Turracher Höhe that is as cozy as it is stylish.”— source · retrieved 2026-11-14

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Last completed renovation

Sourced

2019

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 2019weight 0.70 · retrieved 2026-11-14view source →

“We completely renovated our hotel in 2019 with great attention to light and furnishing details and turned it into a 360° hotel on the Turracher Höhe that is as cozy as it is stylish.”

Own or manage Hotel Kornock?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-kornock-stadl-predlitz" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-kornock-stadl-predlitz.svg" alt="Hotel Kornock — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Stadl-Predlitz

All hotels in Stadl-Predlitz →

Frequently asked

When was Hotel Kornock built?+

We have not yet found a sourced build year for Hotel Kornock (Stadl-Predlitz, Austria).

How old is Hotel Kornock?+

We have not yet found a sourced build year for Hotel Kornock, so its exact age is unverified — but its renovation status and Chrono Score above still show how recent it feels.

When was Hotel Kornock last renovated?+

Its most recent completed renovation was in 2019.

What is the Chrono Score of Hotel Kornock?+

Its Chrono Score is 7.6/10 (Ageing) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status