LIVE DATA · sourced from the web
★★★★Open

Hotel Kompas

Bled, Slovenia

Built 1969 · Last completed renovation 2023

Hotel Kompas in Bled was last renovated in 2023, and originally built in 1969. Its HotelChrono freshness score is 9.0/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 25 Jun 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2031

In about 5 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Bled, Slovenia

Timeline

  1. 1968

    Construction began

  2. 1976

    Partial renovation and expansion (1976-1977)

  3. 2023

    Most recent renovation

⚖️ Star classification · Slovenia

Slovenia uses the Hotelstars Union system. Each classification is valid for a limited period and hotels are reviewed on a regular basis.

System: Hotelstars Union (Ministry of the Economy, Tourism & Sport)

view source →Reviewed Jun 2026Informational — verify with local authorities.

Each classification is valid for a limited period of time, ensuring that hotels are reviewed on a regular basis.

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2023
100 − 3.5 × 3 years = 90
= 9.0 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2023 renovation

Most recent renovation
Year of the last renovation: 2023source · retrieved 2026-06-25

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Built

Sourced

1969

Last completed renovation

Sourced

2023

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Full renovation 2023weight 0.70 · retrieved 2026-06-25view source →

Year of the last renovation: 2023

Secondary · Expansion 1976weight 0.70 · retrieved 2026-06-25view source →

The expansion of tourism and the need of additional capacities caused for the hotel to partially be renovated from 1976 to 1977. At that point the hotel was also expanded.

Secondary · Built 1968weight 0.70 · retrieved 2026-06-25view source →

The construction works began in year 1968

Own or manage Hotel Kompas?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-kompas-bled" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-kompas-bled.svg" alt="Hotel Kompas — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Bled

All hotels in Bled

Frequently asked

When was Hotel Kompas built?+

Hotel Kompas (Bled, Slovenia) was built in 1969.

How old is Hotel Kompas?+

Hotel Kompas is 57 years old — it was built in 1969 and last renovated in 2023. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Hotel Kompas last renovated?+

Its most recent completed renovation was in 2023.

What is the Chrono Score of Hotel Kompas?+

Its Chrono Score is 9.0/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status