LIVE DATA · sourced from the web
★★★★Open

Hotel Galleria

Ljubljana, Slovenia

Built 2003 · Last completed renovation 2019

Hotel Galleria in Ljubljana was last renovated in 2019, and originally built in 2003 (sourced renovations: 2016, 2019). Its HotelChrono freshness score is 7.6/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 26 Jun 2026How we verify →Report an error

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~3-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Ljubljana, Slovenia

Timeline

  1. 2016

    Extensive renovation

  2. 2019

    Complete renovation

⚖️ Star classification · Slovenia

Slovenia uses the Hotelstars Union system. Each classification is valid for a limited period and hotels are reviewed on a regular basis.

System: Hotelstars Union (Ministry of the Economy, Tourism & Sport)

view source →Reviewed Jun 2026Informational — verify with local authorities.

Each classification is valid for a limited period of time, ensuring that hotels are reviewed on a regular basis.

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2019
100 − 3.5 × 7 years = 76
= 7.6 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2019 renovation

Complete renovation
The property was completely renovated in year 2019source · retrieved 2026-06-26

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Built

Sourced

2003

Last completed renovation

Sourced

2019

Renovation history (sourced)

2016·2019

Sources record multiple renovations (20162019). The Chrono Score uses the most recent completed one.

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Full renovation 2019weight 0.70 · retrieved 2026-06-26view source →

The property was completely renovated in year 2019

Secondary · Renovation 2016weight 0.70 · retrieved 2026-06-26view source →

was extensively renovated in spring 2016

Secondary · builtweight 0.70 · retrieved 2026-06-26view source →

The first of these to open was Hotel Galleria, back in 2003, quickly gaining a name as four-star boutique hotel in a building that's a listed national monument.

Own or manage Hotel Galleria?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hotel-galleria-ljubljana" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hotel-galleria-ljubljana.svg" alt="Hotel Galleria — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Ljubljana

All hotels in Ljubljana

Frequently asked

When was Hotel Galleria built?+

Hotel Galleria (Ljubljana, Slovenia) was built in 2003.

How old is Hotel Galleria?+

Hotel Galleria is 23 years old — it was built in 2003 and last renovated in 2019. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Hotel Galleria last renovated?+

Its most recent completed renovation was in 2019.

What is the Chrono Score of Hotel Galleria?+

Its Chrono Score is 7.6/10 (Ageing) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status