Hotel Bellevue
Ribčev Laz, Slovenia
Built 1948 · Last completed renovation 2009
Hotel Bellevue in Ribčev Laz was last renovated in 2009, and originally built in 1948 (sourced renovations: 1948, 1991, 2005, 2009). Its HotelChrono freshness score is 4.1/10 — every date linked to a cited source.
Renovation forecast · estimate
Next renovation expected around 2029
In about 3 years (≈20-year cycle). A model estimate, not a sourced fact.
Timeline
1948
Hotel nationalized by the state
1991
Hotel lost prestige after Slovenian independence
2005
Sold to student agency; converted to dance club
2009
Sold to investment company Mawared International
2025
Reconstruction by BFM (Archdiocese of Ljubljana) planned but not yet started
⚖️ Star classification · Slovenia
Slovenia uses the Hotelstars Union system. Each classification is valid for a limited period and hotels are reviewed on a regular basis.
System: Hotelstars Union (Ministry of the Economy, Tourism & Sport)
“Each classification is valid for a limited period of time, ensuring that hotels are reviewed on a regular basis.”
How this score is computed
Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →
What changed in the 2009 renovation
“In 2009 the hotel was sold again, bought by the investment company Mawared International. They said they wanted to either renovate the hotel or tear it down and replace it with a new one.”— source · retrieved 2026-08-13
Scope is quoted verbatim from the cited source — we never guess what a renovation covered.
Facts
Built
Estimated1948
Last completed renovation
Sourced2009
Renovation history (sourced)
Sources record multiple renovations (1948–2009). The Chrono Score uses the most recent completed one.
Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“reconstruction has not transpired despite a local business now being at the Bellevue's controls. Bled Forest Management (BFM), essentially the purveyor of locally-sourced wood products now has the hotel's future in its hands.”
“In 2009 the hotel was sold again, bought by the investment company Mawared International. They said they wanted to either renovate the hotel or tear it down and replace it with a new one.”
“Only in 2005 it was sold to a student agency which turned the hotel into a dance club. Then several fires destroyed the once so beautiful building to a ruin.”
“After the independence of Slovenia in 1991 Bellevue seems to have lost its prestige.”
“In 1948, while still in her possession, the hotel shared the fate of many private businesses that fell victim to state nationalization.”
Own or manage Hotel Bellevue?
Add your renovation date
Know its timeline. Now check the price.
You’ve seen when it was last renovated — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/hotel-bellevue-ribcev-laz" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/hotel-bellevue-ribcev-laz.svg" alt="Hotel Bellevue — Chrono Score, verified by HotelChrono" width="360" height="112"> </a>
More hotels in Ribčev Laz
All hotels in Ribčev Laz →Frequently asked
When was Hotel Bellevue built?+
Hotel Bellevue (Ribčev Laz, Slovenia) was built in 1948.
How old is Hotel Bellevue?+
Hotel Bellevue is 78 years old — it was built in 1948 and last renovated in 2009. Age measures the building; the Chrono Score measures how fresh it feels today.
When was Hotel Bellevue last renovated?+
Its most recent completed renovation was in 2009.
What is the Chrono Score of Hotel Bellevue?+
Its Chrono Score is 4.1/10 (Tired) — a pure freshness metric.