LIVE DATA · sourced from the web
★★★★Open

Hilton St. Petersburg Bayfront

St. Petersburg, United States

Built 1972 · Last completed renovation 2014

Check availability →May be an affiliate link.

Hilton St. Petersburg Bayfront in St. Petersburg was last renovated in 2014, and originally built in 1972 (sourced renovations: 2003, 2014). Its HotelChrono freshness score is 5.8/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 22 Nov 2026How we verify →Report an error

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~11-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · St. Petersburg, United States

Timeline

  1. 2003

    Public spaces renovation

  2. 2014

    Renovation completed

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2014
100 − 3.5 × 12 years = 58
= 5.8 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2014 renovation

Renovation completed
“Renovated in 2014.”— source · retrieved 2026-11-22

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Built

Sourced

1972

Last completed renovation

Sourced

2014

Renovation history (sourced)

2003·2014

Sources record multiple renovations (2003–2014). The Chrono Score uses the most recent completed one.

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Hilton

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Full renovation 2014weight 0.70 · retrieved 2026-11-22view source →

“Renovated in 2014.”

Secondary · Renovation 2003weight 0.70 · retrieved 2026-11-22view source →

“All public spaces were renovated in late 2003.”

Own or manage Hilton St. Petersburg Bayfront?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hilton-st-petersburg-bayfront-st-petersburg" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hilton-st-petersburg-bayfront-st-petersburg.svg" alt="Hilton St. Petersburg Bayfront — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in St. Petersburg

All hotels in St. Petersburg →All Hilton hotels →

Frequently asked

When was Hilton St. Petersburg Bayfront built?+

Hilton St. Petersburg Bayfront (St. Petersburg, United States) was built in 1972.

How old is Hilton St. Petersburg Bayfront?+

Hilton St. Petersburg Bayfront is 54 years old — it was built in 1972 and last renovated in 2014. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Hilton St. Petersburg Bayfront last renovated?+

Its most recent completed renovation was in 2014.

What is the Chrono Score of Hilton St. Petersburg Bayfront?+

Its Chrono Score is 5.8/10 (Ageing) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status