LIVE DATA · sourced from the web
★★★★Open

Hilton Cocoa Beach Oceanfront

Cocoa Beach, United States

Built 1986 · Last completed renovation 2025

Check availability →May be an affiliate link.

Hilton Cocoa Beach Oceanfront in Cocoa Beach was last renovated in 2025, and originally built in 1986. Its HotelChrono freshness score is 9.7/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 23 Nov 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2033

In about 7 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Cocoa Beach, United States

Timeline

  1. 2025

    Final phase of renovation (suites) completed

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2025
100 − 3.5 × 1 year = 97
= 9.7 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2025 renovation

Final phase of renovation (suites) completed
“Renovations to all public areas and guest rooms were completed in 2024, with the final phase—our suites— completed in October 2025.”— source · retrieved 2026-11-23

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Built

Sourced

1986

Last completed renovation

Sourced

2025

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Hilton

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 2025weight 0.70 · retrieved 2026-11-23view source →

“Renovations to all public areas and guest rooms were completed in 2024, with the final phase—our suites— completed in October 2025.”

Secondary · builtweight 0.70 · retrieved 2026-11-23view source →

“Year Built: 1986”

Own or manage Hilton Cocoa Beach Oceanfront?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/hilton-cocoa-beach-oceanfront-cocoa-beach" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/hilton-cocoa-beach-oceanfront-cocoa-beach.svg" alt="Hilton Cocoa Beach Oceanfront — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Cocoa Beach

All hotels in Cocoa Beach →All Hilton hotels →

Frequently asked

When was Hilton Cocoa Beach Oceanfront built?+

Hilton Cocoa Beach Oceanfront (Cocoa Beach, United States) was built in 1986.

How old is Hilton Cocoa Beach Oceanfront?+

Hilton Cocoa Beach Oceanfront is 40 years old — it was built in 1986 and last renovated in 2025. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Hilton Cocoa Beach Oceanfront last renovated?+

Its most recent completed renovation was in 2025.

What is the Chrono Score of Hilton Cocoa Beach Oceanfront?+

Its Chrono Score is 9.7/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status