Grün Uluwatu in Uluwatu was built in 2023; no completed renovation is yet on record. Its HotelChrono freshness score is 9.6/10.
Renovation forecast · estimate
Next renovation expected around 2031
In about 5 years (≈8-year cycle). A model estimate, not a sourced fact.
Timeline
2023
Hotel opened
How this score is computed
Every figure here traces back to the sourced build year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →
Facts
Stars
4★
Built
Sourced2023
Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“The latest addition, Grün Resort Uluwatu, opened in April 2023, offers 45 rooms across seven different types of units.”
Own or manage Grün Uluwatu?
Add your renovation date
Know its timeline. Now check the price.
You’ve seen when it opened (2023) — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/grun-uluwatu-uluwatu" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/grun-uluwatu-uluwatu.svg" alt="Grün Uluwatu — Chrono Score, verified by HotelChrono" width="360" height="112"> </a>
More hotels in Uluwatu
Frequently asked
When was Grün Uluwatu built?+
Grün Uluwatu (Uluwatu, Indonesia) was built in 2023.
How old is Grün Uluwatu?+
Grün Uluwatu is 3 years old — it was built in 2023. Age measures the building; the Chrono Score measures how fresh it feels today.
Has Grün Uluwatu been renovated recently?+
We have not yet found a sourced completed renovation year for Grün Uluwatu.
What is the Chrono Score of Grün Uluwatu?+
Its Chrono Score is 9.6/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.