LIVE DATA · sourced from the web
★★★★Open

Grün Uluwatu

Uluwatu, Indonesia

Built 2023

Check availability →May be an affiliate link.

Grün Uluwatu in Uluwatu was built in 2023; no completed renovation is yet on record. Its HotelChrono freshness score is 9.6/10.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 22 Nov 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2031

In about 5 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Timeline

  1. 2023

    Hotel opened

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: built 2023, no completed renovation on record
100 − 1.5 × 3 years = 96
= 9.6 / 10 · Fresh

Every figure here traces back to the sourced build year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

Facts

Stars

4★

Built

Sourced

2023

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Built 2023weight 0.70 · retrieved 2026-11-22view source →

“The latest addition, Grün Resort Uluwatu, opened in April 2023, offers 45 rooms across seven different types of units.”

Own or manage Grün Uluwatu?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it opened (2023) — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/grun-uluwatu-uluwatu" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/grun-uluwatu-uluwatu.svg" alt="Grün Uluwatu — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Uluwatu

All hotels in Uluwatu →

Frequently asked

When was Grün Uluwatu built?+

Grün Uluwatu (Uluwatu, Indonesia) was built in 2023.

How old is Grün Uluwatu?+

Grün Uluwatu is 3 years old — it was built in 2023. Age measures the building; the Chrono Score measures how fresh it feels today.

Has Grün Uluwatu been renovated recently?+

We have not yet found a sourced completed renovation year for Grün Uluwatu.

What is the Chrono Score of Grün Uluwatu?+

Its Chrono Score is 9.6/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status