LIVE DATA · sourced from the web
★★★★Open

Grand Hotel Napoca

Cluj-Napoca, Romania

Built · Last completed renovation 2022

Grand Hotel Napoca in Cluj-Napoca was last renovated in 2022 (sourced renovations: 2010, 2012, 2022). Its HotelChrono freshness score is 8.6/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 12 Sept 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2028

In about 2 years (≈6-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Cluj-Napoca, Romania

Timeline

  1. 2010

    Renovation completed in 2010

  2. 2012

    Renovation year listed as 2012

  3. 2022

    Complete renovation completed in 2022

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2022
100 − 3.5 × 4 years = 86
= 8.6 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2022 renovation

Complete renovation completed in 2022
The hotel was completely renovated in 2022 and features 148 rooms and 6 elegant suites, a restaurant with gourmet dishes, a bar, and event halls with a capacity of up to 1600 people in a single room.source · retrieved 2026-09-12

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Last completed renovation

Sourced

2022

Renovation history (sourced)

2010·2012·2022

Sources record multiple renovations (20102022). The Chrono Score uses the most recent completed one.

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 2022weight 0.70 · retrieved 2026-09-12view source →

The hotel was completely renovated in 2022 and features 148 rooms and 6 elegant suites, a restaurant with gourmet dishes, a bar, and event halls with a capacity of up to 1600 people in a single room.

Secondary · Renovation 2012weight 0.70 · retrieved 2026-09-12view source →

Year of renovation 2012

Weak source · Renovation 2010weight 0.50 · retrieved 2026-09-12view source →

The New Grand Hotel Napoca was entirely renovated in 2010.

Own or manage Grand Hotel Napoca?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/grand-hotel-napoca-cluj-napoca" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/grand-hotel-napoca-cluj-napoca.svg" alt="Grand Hotel Napoca — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Cluj-Napoca

All hotels in Cluj-Napoca

Frequently asked

When was Grand Hotel Napoca built?+

We have not yet found a sourced build year for Grand Hotel Napoca (Cluj-Napoca, Romania).

How old is Grand Hotel Napoca?+

We have not yet found a sourced build year for Grand Hotel Napoca, so its exact age is unverified — but its renovation status and Chrono Score above still show how recent it feels.

When was Grand Hotel Napoca last renovated?+

Its most recent completed renovation was in 2022.

What is the Chrono Score of Grand Hotel Napoca?+

Its Chrono Score is 8.6/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status