LIVE DATA · sourced from the web
★★★★★Open

Four Seasons Resort Mallorca at Formentor

Port de Pollença, Spain

Built 1929 · Last completed renovation 2025

Check availability →May be an affiliate link.

Four Seasons Resort Mallorca at Formentor in Port de Pollença was last renovated in 2025, and originally built in 1929 (sourced renovations: 2024, 2025). Its HotelChrono freshness score is 9.7/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 22 Nov 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2033

In about 7 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Port de Pollença, Spain

Timeline

  1. 2024

    Partial opening after renovation

  2. 2025

    Full reopening after renovation completion

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2025
100 − 3.5 × 1 year = 97
= 9.7 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2025 renovation

Full reopening after renovation completion
“Following a partial opening in summer 2024 and the completion of renovation work, the resort will fully reopen on March 14, 2025 with a host of luxury experiences, new dining destinations, and an extraordinary wellness centre designed to help guests reset body and mind in a breathtaking setting.”— source · retrieved 2026-11-22

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

5★

Built

Sourced

1929

Last completed renovation

Sourced

2025

Renovation history (sourced)

2024·2025

Sources record multiple renovations (2024–2025). The Chrono Score uses the most recent completed one.

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Four Seasons

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Renovation 2025weight 0.70 · retrieved 2026-11-22view source →

“Following a partial opening in summer 2024 and the completion of renovation work, the resort will fully reopen on March 14, 2025 with a host of luxury experiences, new dining destinations, and an extraordinary wellness centre designed to help guests reset body and mind in a breathtaking setting.”

Secondary · Reopening 2024weight 0.70 · retrieved 2026-11-22view source →

“The Four Seasons Resort Mallorca at Formentor Opened August 16, 2024, after an extensive renovation of the former Hotel Formentor.”

Secondary · builtweight 0.70 · retrieved 2026-11-22view source →

“The Hotel Formentor opened its doors in 1929 and welcomed a myriad of celebrity guests, including Winston Churchill, Audrey Hepburn, Grace Kelly, and the Dalai Lama.”

Own or manage Four Seasons Resort Mallorca at Formentor?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/four-seasons-resort-mallorca-at-formentor-port-de-pollenca" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/four-seasons-resort-mallorca-at-formentor-port-de-pollenca.svg" alt="Four Seasons Resort Mallorca at Formentor — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Port de Pollença

All hotels in Port de Pollença →All Four Seasons hotels →

Frequently asked

When was Four Seasons Resort Mallorca at Formentor built?+

Four Seasons Resort Mallorca at Formentor (Port de Pollença, Spain) was built in 1929.

How old is Four Seasons Resort Mallorca at Formentor?+

Four Seasons Resort Mallorca at Formentor is 97 years old — it was built in 1929 and last renovated in 2025. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Four Seasons Resort Mallorca at Formentor last renovated?+

Its most recent completed renovation was in 2025.

What is the Chrono Score of Four Seasons Resort Mallorca at Formentor?+

Its Chrono Score is 9.7/10 (Fresh) — a pure freshness metric, separate from its 5-star rating.

Explore hotels by renovation status