Embassy Suites by Hilton Santa Ana Orange County Airport
Santa Ana, United States
Built 1985 · Last completed renovation 2018
Embassy Suites by Hilton Santa Ana Orange County Airport in Santa Ana was last renovated in 2018, and originally built in 1985 (sourced renovations: 1997, 2018). Its HotelChrono freshness score is 7.2/10 — every date linked to a cited source.
Renovation forecast · estimate
Next renovation expected around 2039
In about 13 years (≈21-year cycle). A model estimate, not a sourced fact.
Location
Satellite view · Santa Ana, United States
Timeline
1985
Hotel built
1997
Earlier renovation
2018
Full renovation and redesign completed
How this score is computed
Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →
What changed in the 2018 renovation
Facts
Built
Sourced1985
Last completed renovation
Sourced2018
Renovation history (sourced)
Sources record multiple renovations (1997–2018). The Chrono Score uses the most recent completed one.
Ownership & operator
Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.
Ownership data depth
1/3 · 33%
- ✓ Operating brand
- ○ Management / operator
- ○ Ownership
FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.
See the Renovation Radar →Sources
Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.
“About Us All-suite upscale hotel renovated and redesigned completed 2018.”
“Built 1985 Renovated 2018”
“History: Built 1985. Renovated 1997.”
“History: Built 1985. Renovated 1997.”
“Built in 1985”
Own or manage Embassy Suites by Hilton Santa Ana Orange County Airport?
Add your renovation date
Know its timeline. Now check the price.
You’ve seen when it was last renovated — book with confidence.
Booking links may be affiliate links.
For hoteliers
🏷️ Embed this Chrono Score on your site+
Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.
<a href="https://hotelchrono.com/hotel/embassy-suites-by-hilton-santa-ana-orange-county-airport-santa-ana" target="_blank" rel="noopener"> <img src="https://hotelchrono.com/api/badge/embassy-suites-by-hilton-santa-ana-orange-county-airport-santa-ana.svg" alt="Embassy Suites by Hilton Santa Ana Orange County Airport — Chrono Score, verified by HotelChrono" width="360" height="112"> </a>
More Embassy Suites hotels
See Embassy Suites hotels by renovation freshness →Frequently asked
When was Embassy Suites by Hilton Santa Ana Orange County Airport built?+
Embassy Suites by Hilton Santa Ana Orange County Airport (Santa Ana, United States) was built in 1985.
How old is Embassy Suites by Hilton Santa Ana Orange County Airport?+
Embassy Suites by Hilton Santa Ana Orange County Airport is 41 years old — it was built in 1985 and last renovated in 2018. Age measures the building; the Chrono Score measures how fresh it feels today.
When was Embassy Suites by Hilton Santa Ana Orange County Airport last renovated?+
Its most recent completed renovation was in 2018.
What is the Chrono Score of Embassy Suites by Hilton Santa Ana Orange County Airport?+
Its Chrono Score is 7.2/10 (Ageing) — a pure freshness metric.