LIVE DATA · sourced from the web
Open

Embassy Suites by Hilton Santa Ana Orange County Airport

Santa Ana, United States

Built 1985 · Last completed renovation 2018

Embassy Suites by Hilton Santa Ana Orange County Airport in Santa Ana was last renovated in 2018, and originally built in 1985 (sourced renovations: 1997, 2018). Its HotelChrono freshness score is 7.2/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 11 Nov 2026How we verify →Report an error

Renovation forecast · estimate

Next renovation expected around 2039

In about 13 years (≈21-year cycle). A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Santa Ana, United States

Timeline

  1. 1985

    Hotel built

  2. 1997

    Earlier renovation

  3. 2018

    Full renovation and redesign completed

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2018
100 − 3.5 × 8 years = 72
= 7.2 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2018 renovation

Full renovation and redesign completed
“About Us All-suite upscale hotel renovated and redesigned completed 2018.”— source · retrieved 2026-11-11
“Built 1985 Renovated 2018”— source · retrieved 2026-11-11

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Built

Sourced

1985

Last completed renovation

Sourced

2018

Renovation history (sourced)

1997·2018

Sources record multiple renovations (1997–2018). The Chrono Score uses the most recent completed one.

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Embassy Suites

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · renovation 2018weight 0.70 · retrieved 2026-11-11view source →

“About Us All-suite upscale hotel renovated and redesigned completed 2018.”

Secondary · Full renovation 2018weight 0.70 · retrieved 2026-11-11view source →

“Built 1985 Renovated 2018”

Weak source · Renovation 1997weight 0.50 · retrieved 2026-11-11view source →

“History: Built 1985. Renovated 1997.”

Weak source · Built 1985weight 0.50 · retrieved 2026-11-11view source →

“History: Built 1985. Renovated 1997.”

Secondary · builtweight 0.70 · retrieved 2026-11-11view source →

“Built in 1985”

Own or manage Embassy Suites by Hilton Santa Ana Orange County Airport?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/embassy-suites-by-hilton-santa-ana-orange-county-airport-santa-ana" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/embassy-suites-by-hilton-santa-ana-orange-county-airport-santa-ana.svg" alt="Embassy Suites by Hilton Santa Ana Orange County Airport — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More Embassy Suites hotels

See Embassy Suites hotels by renovation freshness →

Frequently asked

When was Embassy Suites by Hilton Santa Ana Orange County Airport built?+

Embassy Suites by Hilton Santa Ana Orange County Airport (Santa Ana, United States) was built in 1985.

How old is Embassy Suites by Hilton Santa Ana Orange County Airport?+

Embassy Suites by Hilton Santa Ana Orange County Airport is 41 years old — it was built in 1985 and last renovated in 2018. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Embassy Suites by Hilton Santa Ana Orange County Airport last renovated?+

Its most recent completed renovation was in 2018.

What is the Chrono Score of Embassy Suites by Hilton Santa Ana Orange County Airport?+

Its Chrono Score is 7.2/10 (Ageing) — a pure freshness metric.

Explore hotels by renovation status