LIVE DATA · sourced from the web
★★★★Open

Courtyard by Marriott Schwerin

Schwerin, Germany

Built 1996 · Last completed renovation 2022

Check availability →May be an affiliate link.

Courtyard by Marriott Schwerin in Schwerin was last renovated in 2022, and originally built in 1996 (sourced renovations: 2018, 2022). Its HotelChrono freshness score is 8.6/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 22 Nov 2026How we verify →Report an error

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~4-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Schwerin, Germany

Timeline

  1. 1996

    Hotel constructed

  2. 2018

    Renovation completed in 2018

  3. 2022

    Most recent documented renovation

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2022
100 − 3.5 × 4 years = 86
= 8.6 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2022 renovation

Most recent documented renovation
“Year Last Renovated: 2022”— source · retrieved 2026-11-22

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

4★

Built

Sourced

1996

Last completed renovation

Sourced

2022

Renovation history (sourced)

2018·2022

Sources record multiple renovations (2018–2022). The Chrono Score uses the most recent completed one.

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Courtyard

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · Full renovation 2022weight 0.70 · retrieved 2026-11-22view source →

“Year Last Renovated: 2022”

Secondary · Renovation 2018weight 0.70 · retrieved 2026-11-22view source →

“Construction date 1996 · Year of renovation 2018”

Secondary · Built 1996weight 0.70 · retrieved 2026-11-22view source →

“Year Built: 1996”

Own or manage Courtyard by Marriott Schwerin?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/courtyard-by-marriott-schwerin-schwerin" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/courtyard-by-marriott-schwerin-schwerin.svg" alt="Courtyard by Marriott Schwerin — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More Courtyard hotels

See Courtyard hotels by renovation freshness →

Frequently asked

When was Courtyard by Marriott Schwerin built?+

Courtyard by Marriott Schwerin (Schwerin, Germany) was built in 1996.

How old is Courtyard by Marriott Schwerin?+

Courtyard by Marriott Schwerin is 30 years old — it was built in 1996 and last renovated in 2022. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Courtyard by Marriott Schwerin last renovated?+

Its most recent completed renovation was in 2022.

What is the Chrono Score of Courtyard by Marriott Schwerin?+

Its Chrono Score is 8.6/10 (Fresh) — a pure freshness metric, separate from its 4-star rating.

Explore hotels by renovation status