LIVE DATA · sourced from the web
★★★★★Open

Clarion Hotel Post

Gothenburg, Sweden

Built 2012 · Last completed renovation 2012

Clarion Hotel Post in Gothenburg was last renovated in 2012, and originally built in 2012. Its HotelChrono freshness score is 5.1/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 27 Jul 2026How we verify →Report an error

Data check

  • · Sources disagree on the opening year — under review

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · Gothenburg, Sweden

Timeline

  1. 1925

    Original post office building (Posthuset) constructed

  2. 2012

    Hotel opened after conversion of former post office

  3. 2025

    Ground floor renovation (March–May 2025)

  4. 2012

    Renovation completed

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2012
100 − 3.5 × 14 years = 51
= 5.1 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2012 renovation

Renovation completed
It opened on 26 January 2012.source · retrieved 2026-07-27
After the old post office building underwent a major renovation, it reopened as the Clarion Hotel Post in 2012.source · retrieved 2026-07-27

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

5★

Built

Sourced

2012

Last completed renovation

Sourced

2012

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · renovation_started 2025weight 0.70 · retrieved 2026-07-27view source →

Renovation work on the ground floor will be carried out from 10/03/2025 to 11/05/2025. Some rooms may be affected by noise.

Reference (Wikipedia) · Built 2012weight 0.65 · retrieved 2026-07-27view source →

It opened on 26 January 2012.

Secondary · Full renovation 2012weight 0.70 · retrieved 2026-07-27view source →

After the old post office building underwent a major renovation, it reopened as the Clarion Hotel Post in 2012.

Weak source · Built 1925weight 0.50 · retrieved 2026-07-27view source →

Originally constructed in 1925 as Gothenburg's main post office, the building was designed in a neoclassical style by architect Ernst Torulf.

Own or manage Clarion Hotel Post?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/clarion-hotel-post-gothenburg" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/clarion-hotel-post-gothenburg.svg" alt="Clarion Hotel Post — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Gothenburg

All hotels in Gothenburg

Frequently asked

When was Clarion Hotel Post built?+

Clarion Hotel Post (Gothenburg, Sweden) was built in 2012.

How old is Clarion Hotel Post?+

Clarion Hotel Post is 14 years old — it was built in 2012 and last renovated in 2012. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Clarion Hotel Post last renovated?+

Its most recent completed renovation was in 2012.

What is the Chrono Score of Clarion Hotel Post?+

Its Chrono Score is 5.1/10 (Ageing) — a pure freshness metric, separate from its 5-star rating.

Explore hotels by renovation status