LIVE DATA · sourced from the web
Open

Aloft El Paso Downtown (Bassett Tower)

El Paso, United States

Built 2018 · Last completed renovation 2018

Check availability →May be an affiliate link.

Aloft El Paso Downtown (Bassett Tower) in El Paso was last renovated in 2018, and originally built in 2018. Its HotelChrono freshness score is 7.2/10 — every date linked to a cited source.

HotelChronoSourced & VerifiedMedium confidenceLast verified: 22 Nov 2026How we verify →Report an error

Data check

  • · Sources disagree on the opening year — under review

Renovation forecast · estimate

Likely due for renovation now

Past its typical ~8-year renovation cycle. A model estimate, not a sourced fact.

Renovation Radar →

Location

Satellite view · El Paso, United States

Timeline

  1. 1930

    Original Bassett Tower office building completed

  2. 2018

    Building converted into a hotel (Aloft)

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2018
100 − 3.5 × 8 years = 72
= 7.2 / 10 · Ageing

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2018 renovation

Building converted into a hotel (Aloft)
“Recently, underwent a $10 million renovation that was finished in May 2018 and opened up as an 89-room Aloft Hotel.”— source · retrieved 2026-11-22
“The building was converted to a hotel in 2018.”— source · retrieved 2026-11-22

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Built

Sourced

2018

Last completed renovation

Sourced

2018

Ownership & operator

Who runs and owns this hotel, at the company level — from public sources. The decision layer behind every renovation.

Ownership data depth

1/3 · 33%

  • ✓ Operating brand
  • ○ Management / operator
  • ○ Ownership

Operating brand

Aloft

Flag this hotel operates under.

FF&E supplier or contractor? The Renovation Radar package adds the ownership group, operator and a sourced public business contact for hotels approaching their renovation cycle.

See the Renovation Radar →

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Reference (Wikipedia) · renovation 2018weight 0.65 · retrieved 2026-11-22view source →

“Recently, underwent a $10 million renovation that was finished in May 2018 and opened up as an 89-room Aloft Hotel.”

Secondary · Renovation 2018weight 0.70 · retrieved 2026-11-22view source →

“The building was converted to a hotel in 2018.”

Secondary · Built 1930weight 0.70 · retrieved 2026-11-22view source →

“The O.T. Bassett Tower was completed in September, 1930 and was briefly the tallest building in El Paso, until the completion of the Hilton Hotel later the same year.”

Own or manage Aloft El Paso Downtown (Bassett Tower)?

Add your renovation date

Know its timeline. Now check the price.

You’ve seen when it was last renovated — book with confidence.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/aloft-el-paso-downtown-bassett-tower-el-paso" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/aloft-el-paso-downtown-bassett-tower-el-paso.svg" alt="Aloft El Paso Downtown (Bassett Tower) — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in El Paso

All hotels in El Paso →All Aloft hotels →

Frequently asked

When was Aloft El Paso Downtown (Bassett Tower) built?+

Aloft El Paso Downtown (Bassett Tower) (El Paso, United States) was built in 2018.

How old is Aloft El Paso Downtown (Bassett Tower)?+

Aloft El Paso Downtown (Bassett Tower) is 8 years old — it was built in 2018 and last renovated in 2018. Age measures the building; the Chrono Score measures how fresh it feels today.

When was Aloft El Paso Downtown (Bassett Tower) last renovated?+

Its most recent completed renovation was in 2018.

What is the Chrono Score of Aloft El Paso Downtown (Bassett Tower)?+

Its Chrono Score is 7.2/10 (Ageing) — a pure freshness metric.

Explore hotels by renovation status